Skip to main content

JCCBI says US$300m for demolishing Montreal’s old Champlain Bridge

Tearing down the old steel truss cantilever Champlain Bridge in Montreal could cost around US$300 million, according to preliminary estimates by a federal government agency. Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city. Dismantling will start in 2019 at the earliest and
April 11, 2017 Read time: 2 mins
Tearing down the old steel truss cantilever Champlain Bridge in Montreal could cost around US$300 million, according to preliminary estimates by a federal government agency.

Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to 2880 Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city.

Dismantling will start in 2019 at the earliest and it will take up to four years, Canadian media reported. JCCBI has said that material from the old bridge will be recycled and used in projects around Montreal.

More than 140,000 cars use it daily, making it one of the busiest single-span bridges in Canada. But years of heavy use of de-icing salt during harsh winters has deteriorated the structure.

Work on a new bridge started in 2016 and it is scheduled to open at the end of 2018.

The 6km Champlain Bridge, opened in 1962, along with approach viaducts is made of prestressed concrete beams supporting a prestressed concrete deck overlaid with paved with asphalt. The total bridge complex is around 14.5km and spans the Saint Lawrence River and Saint Lawrence Seaway, connecting the Montreal boroughs of Verdun and Le Sud-Ouest to Brossard. It is named after the French explorer Samuel de Champlain, who founded Quebec City, the Quebec province’s capital, in 1608.

Together with the Jacques Cartier Bridge, it is administered by JCCBI, a Canadian Crown Corporation which reports to Infrastructure Canada.

For more information on companies in this article

Related Content

  • Major US interchange project underway
    February 14, 2012
    Work is starting in the US on a US$356 million interchange project that will connect I-95, I-91 and Route 34 Interchange in New Haven.
  • Haulotte wraps it up at Turkey’s Osman Gazi Bridge
    July 5, 2016
    French access group Haulotte and the Turkish access distributor and rental group Acarlar continue to contribute to major infrastructure projects in Turkey, including the new Osman Gazi Bridge. The bridge – the third Bosporus crossing - has just been completed with the installation of the last bridge deck. The bridge will reach a height of 252m and the bridge deck will be nearly 26m wide. When it soon opens, the bridge will be the fourth longest suspension bridge in the world by the length of its central
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Alberta eyes La Crete Ferry replacement
    September 2, 2020
    The Canadian province is considering a toll bridge over the Peace River.