Skip to main content

JCCBI says US$300m for demolishing Montreal’s old Champlain Bridge

Tearing down the old steel truss cantilever Champlain Bridge in Montreal could cost around US$300 million, according to preliminary estimates by a federal government agency. Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city. Dismantling will start in 2019 at the earliest and
April 11, 2017 Read time: 2 mins
Tearing down the old steel truss cantilever Champlain Bridge in Montreal could cost around US$300 million, according to preliminary estimates by a federal government agency.

Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to 2880 Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city.

Dismantling will start in 2019 at the earliest and it will take up to four years, Canadian media reported. JCCBI has said that material from the old bridge will be recycled and used in projects around Montreal.

More than 140,000 cars use it daily, making it one of the busiest single-span bridges in Canada. But years of heavy use of de-icing salt during harsh winters has deteriorated the structure.

Work on a new bridge started in 2016 and it is scheduled to open at the end of 2018.

The 6km Champlain Bridge, opened in 1962, along with approach viaducts is made of prestressed concrete beams supporting a prestressed concrete deck overlaid with paved with asphalt. The total bridge complex is around 14.5km and spans the Saint Lawrence River and Saint Lawrence Seaway, connecting the Montreal boroughs of Verdun and Le Sud-Ouest to Brossard. It is named after the French explorer Samuel de Champlain, who founded Quebec City, the Quebec province’s capital, in 1608.

Together with the Jacques Cartier Bridge, it is administered by JCCBI, a Canadian Crown Corporation which reports to Infrastructure Canada.

For more information on companies in this article

Related Content

  • Doka rises to the challenge on Turkey’s Eyiste Viaduct
    June 4, 2019
    Formwork specialist Doka recently rose to the challenge on Turkey’s Eyiste Viadust, the country’s highest bridge with piers up to 155m tall. The Eyiste Viaduct will be part of a route between Central Anatolia and Turkey’s Mediterranean region, shortening travel time between the cities of Konya and Alanya. Cantilever forming travellers and Doka’s automatic climbing formwork Xclimb 60 were part of the construction solution. The viaduct is nearly 1.4km long and carried by two abutments and eight piers, stret
  • Ferrovial loses control of Canada’s 407 Express Toll Road
    August 27, 2019
    Ferrovial has lost control of the 407 International highway in Canada, one of the Spanish group's star assets. The Supreme Court in the province of Ontario has ruled in favour of co-shareholder pension fund Canada Pension Plan Investment Board to buy another stake - 10.01% - in the highway. The shares are up for sale by another shareholder, Montreal-based global infrastructure engineering firm SNC-Lavalin. The court denied Ferrovial, which already has the largest shareholding at 43% in the highway, th
  • Concession tender for Brazilian bridge
    December 8, 2014
    Brazil’s Transport Ministry is putting the concession contract to maintain the Rio-Niterói bridge in Rio de Janeiro out to tender. The present 20-year maintenance contract for the bridge held by Ponte will run out in May 31st 2015, reports Business News Americas. The new concession deal will involve maintaining the structure as well as building an underpass underneath Renascença square in Niterói. Construction of the 13.3km pre-stressed concrete structure commenced in 1968 and was completed in 1974, at whic
  • VIDEO: How many Caterpillars does it take to demolish a bridge in Canada?
    August 12, 2015
    At least nine, all in a row, according to a recent video shot in a town close to Montreal in the eastern province of Quebec.

    It was feeding time last month for a clutch of 178 Caterpillar’s hydraulic 350 and 336D excavators as they nibbled, pounded and munched their way through the redundant road bridge in Vaudreuil.

    The Avenue St-Charles overpass was surplus to requirements after a multi-million dollar interchange revamp was completed that included building a wider bridge next to the old one.