Skip to main content

Israel tolled lane projects delayed

The tender process for the construction of tolled lanes around Tel Aviv now looks set to be delayed. The additional lanes are planned to be built at key points on the network around Tel Aviv in a bid to cut congestion. An earlier project for a tolled lane in the Tel Aviv area, linking the Shappirim Interchange with the centre of the city, has proven highly successful at helping to reduce congestion levels. The three new sections are intended to further improve traffic flow in and around the city. These lane
August 10, 2018 Read time: 2 mins

The tender process for the construction of tolled lanes around Tel Aviv now looks set to be delayed. The additional lanes are planned to be built at key points on the network around Tel Aviv in a bid to cut congestion. An earlier project for a tolled lane in the Tel Aviv area, linking the Shappirim Interchange with the centre of the city, has proven highly successful at helping to reduce congestion levels. The three new sections are intended to further improve traffic flow in and around the city. These lanes would link the city with the Shefayim Interchange, Morasha Interchange and Rishon Lezion.

The tender documents for the three lanes could still be published in the fourth quarter of 2018, although this would be 12 months after the original timeline. The projects will all be handled under the PPP model. The work will include building two new parking lots and 110km of tolled lanes. Variable price tolling will be used, as with the existing lane.

Related Content

  • Massachusetts Turnpike upgrade delayed
    December 3, 2020
    Upgrade work on the Massachusetts Turnpike in Boston will now be delayed.
  • Last section of Osman Gazi Bridge lifted into place over Izmit Gulf
    May 4, 2016
    The last section of the 3km İzmit Bay Bridge – now officially the Osman Gazi Bridge - was lifted into place on April 21, according to Turkish media. When open later this summer, the bridge will cut the 70-minute drive around İzmit Gulf, on the Sea of Marmara, to just six minutes.
  • Approval for Moscow’s ring road reconstruction
    October 15, 2015
    Moscow’s ring road is due for rebuilding – Eugene Gerden writes. The Moscow city authorities have finalised the project of the reconstruction of the Moscow Ring Road. The ring road encircles the City of Moscow and the plan was announced by Marat Khusnullin, deputy mayor of the city. Khusnullin said that, to date, the Moscow city government has completed 90% of the design documentation of the project.
  • New bridge planned for Kenya’s key port of Mombasa
    August 9, 2017
    A new bridge in Kenya’s premier port of Mombasa is being planned. This will be the second Nyali Bridge and it is being built in a bid to cut congestion as the existing structure is unable to cope with the current traffic volumes. The new bridge will be 600m long and the project will also include building 400m of connecting roads to link the structure to the existing network. The Kenya Urban Roads Authority (KURA) is due to open the tender process shortly. The winner of the tender will have the job of design