Skip to main content

Innovative bridge in Abu Dhabi

The new Sheikh Zayed Bridge in Abu Dhabi is now carrying traffic.
February 23, 2012 Read time: 1 min
The new Sheikh Zayed Bridge in Abu Dhabi is now carrying traffic. The US$266.6 million bridge measures 845m long and features eight traffic lanes, with four in either direction and was designed by architect 4122 Zaha Hadid. This new structure connects Abu Dhabi to the mainland and will help cope with the rapidly increasing traffic volumes in the area. The structure features an innovative design combining concrete pre-stressed boxes, steel arches and a cable stayed section, with much of the engineering work having been carried out by consultant 3096 High Point Rendel.

For more information on companies in this article

Related Content

  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Cairo’s Ring Road upgrade project
    June 11, 2020
    Cairo’s Ring Road is being widened to boost capacity.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • New York’s new bridge opens
    September 10, 2018
    The second span of the New York’s new cable-stayed bridge has now been completed and has opened to traffic. The final span of the Governor Mario M Cuomo Bridge, which replaced the Tappan Zee Bridge, has now been opened to drivers. The opening was delayed slightly due to concerns over the state of a section of the old bridge, now being demolished. The new link was constructed by a joint venture headed by Fluor. With the new bridge opening, all four lanes of eastbound traffic shifted to the new second span. T