Skip to main content

Indonesia toll road projects face construction delays

The collapse of an elevated toll road section in Indonesia has triggered delays to ongoing projects for new links. A stretch of the Bekasi-Cawang-Kampung Melayu (Becakayu) toll road section in East Jakarta collapsed. As a result, work on a series of elevated highway projects has been halted. The projects are the Cimanggis-Cibitung toll road, Ciawi-Sukabumi toll road, Cibitung-Cilincing toll road, Jakarta toll road, Kayu Agung-Palembang-Betung toll road, Krian-Legundi-Bunder-Manyar toll road, Pasuruan-Probo
March 9, 2018 Read time: 1 min
The collapse of an elevated toll road section in Indonesia has triggered delays to ongoing projects for new links. A stretch of the Bekasi-Cawang-Kampung Melayu (Becakayu) toll road section in East Jakarta collapsed. As a result, work on a series of elevated highway projects has been halted.


The projects are the Cimanggis-Cibitung toll road, Ciawi-Sukabumi toll road, Cibitung-Cilincing toll road, Jakarta toll road, Kayu Agung-Palembang-Betung toll road, Krian-Legundi-Bunder-Manyar toll road, Pasuruan-Probolinggo toll road, Serpong-Cinere toll road, Surakarta-Ngawi toll road and Terbangi Besar-Kayu Agung-Pematang Panggang toll road.

In addition new safety measures are being implemented for the Becakayu toll road, Depok-Antasar project and the Jakarta-Cikampek toll road.

Meanwhile funding from China is being sought for a new bridge to connect Batam and Bintan in Riau islands. Building the 7km-long bridge is expected to cost US$190.5 million.

Related Content

  • Indonesia bridge feasibility study delay
    November 4, 2016
    The pre-feasibility study for a US$400 million bridge project in Indonesia has been delayed. The East Nusa Tenggara bridge project is planned to include an innovative tidal power generation system. The study was due to commence in December 2016 but now looks likely to be held back. The 1.6km bridge will provide a link between the Indonesian islands of Andonara and Flores. The aim of the project is to build a crossing that also includes turbines able to generate up to 300MW due to the tidal flow passing thro
  • Costa Rica road project delay
    November 29, 2024
    A key Costa Rica road project faces delays and questions.
  • Indonesian road tunnel planned
    May 8, 2019
    Plans are being drawn up in Indonesia for a new road tunnel project, with construction planned to commence in 2021. The tunnel will feature parallel tubes and is expected to cost US$231 million to construct. It will measure 7km, making it one of the longest road tunnels in Indonesia. The tunnel will form part of the 96km Bengkulu-Lubuk Linggau tolled highway, which is being built in three main sections. The three sections of the tolled route are from Lubuk Linggau to Kepahiang, from Taba Penanjung to Bengku
  • Russia’s trans-continental route
    August 10, 2018
    Russia is spending US$10 billion on building a 2,000km section of road connecting China with the EU – Eugene Gerden reports Russia has now started building a 2,000km section of a new transcontinental route, which will connect China and the EU. According to senior officials from the Russian Ministry of Transport, which is implementing the project, the new road, will be known as the Meridian and will stretch through the Russian territory that borders with Kazakhstan and Belarus. This route forms the Russian