Skip to main content

Indiana bridge being designed by Parsons

Parsons will handle the design work for a new bridge in Indiana carrying the SR 249 route. The bridge will replace an ageing structure carrying George Nelson Drive across the US 12 Dunes Highway, as well as two rail lines at the town of Portage. The design-bid-build project was awarded by the Indiana Department of Transportation. The existing bridge carries around 10,000 vehicles/day of which around 40% comprises freight carrying heavy trucks. The bridge link is critical as this is the only major entrance
January 3, 2018 Read time: 2 mins
3220 Parsons will handle the design work for a new bridge in Indiana carrying the SR 249 route. The bridge will replace an ageing structure carrying George Nelson Drive across the US 12 Dunes Highway, as well as two rail lines at the town of Portage. The design-bid-build project was awarded by the Indiana Department of Transportation. The existing bridge carries around 10,000 vehicles/day of which around 40% comprises freight carrying heavy trucks. The bridge link is critical as this is the only major entrance to the Port of Indiana-Burns Harbor, one of the busiest ports in the Midwest. It is also the state’s only deep-water port that receives ships carrying cargo to and from international destinations across Lake Michigan.

Parsons’ services will include bridge, roadway, and maintenance of traffic design as well as National Environmental Policy Act studies and documentation, a topographic survey, geotechnical investigations, right of way acquisition, public outreach, and utility coordination. The new 10 span structure will be 314m long.

For more information on companies in this article

Related Content

  • Bridge lift contract awarded for Georgia State
    January 16, 2024
    A major bridge lift contract has been awarded in Georgia State.
  • Bold move aids Ironton-Russell bridge works in U.S.
    January 24, 2014
    The bold decision to go against the norm and build the back spans using falsework for the Ironton-Russell replacement bridge between Parkersburg, Kentucky and Cincinnati, Ohio allowed land access to build the main span which, along with the first use in the U.S. of precast stay anchor blocks, meant the new structure could get built.
  • Carry on Movin’ On - Michelin’s mobility event
    October 15, 2018
    Many of the great and the good in the global mobility sector gathered at this year’s Movin’ On event in Montreal. Measured regulation of technologies and safety issues were major themes, reports David Arminas Autonomous vehicles, platooning, smart intersections and safety – these were the talking points over two and half days of the Movin’ On event in Montreal. Everyone in the mobility sector is at the same point, trying to see what mobility will look like in the future. Apparent at the event was just
  • Kenyan key contract being built by Bechtel
    August 9, 2017
    Bechtel has won a major project to build and important highway link in Kenya. This will be the first long stretch of high-speed expressway in Kenya and will connect the capital, Nairobi, with the country’s main port, Mombasa. The project for the 473km connection is being supported with financing from US and UK sources. Once the new route is open to traffic, journeys between Nairobi will take just four hours by road, instead of 10 at present.