Skip to main content

Indiana bridge being designed by Parsons

Parsons will handle the design work for a new bridge in Indiana carrying the SR 249 route. The bridge will replace an ageing structure carrying George Nelson Drive across the US 12 Dunes Highway, as well as two rail lines at the town of Portage. The design-bid-build project was awarded by the Indiana Department of Transportation. The existing bridge carries around 10,000 vehicles/day of which around 40% comprises freight carrying heavy trucks. The bridge link is critical as this is the only major entrance
January 3, 2018 Read time: 2 mins
3220 Parsons will handle the design work for a new bridge in Indiana carrying the SR 249 route. The bridge will replace an ageing structure carrying George Nelson Drive across the US 12 Dunes Highway, as well as two rail lines at the town of Portage. The design-bid-build project was awarded by the Indiana Department of Transportation. The existing bridge carries around 10,000 vehicles/day of which around 40% comprises freight carrying heavy trucks. The bridge link is critical as this is the only major entrance to the Port of Indiana-Burns Harbor, one of the busiest ports in the Midwest. It is also the state’s only deep-water port that receives ships carrying cargo to and from international destinations across Lake Michigan.

Parsons’ services will include bridge, roadway, and maintenance of traffic design as well as National Environmental Policy Act studies and documentation, a topographic survey, geotechnical investigations, right of way acquisition, public outreach, and utility coordination. The new 10 span structure will be 314m long.

For more information on companies in this article

Related Content

  • AtkinsRéalis wins Île d’Orléans Bridge work
    May 2, 2024
    VIDEO: The new US$1.96 billion replacement Île d’Orléans Bridge near Quebec city, Canada, will feature two wider lanes of traffic, shoulders, multi-use lanes for pedestrians and cyclists as well as redevelopment of a major interchange and creation of green spaces.
  • CH2M to rehabilitate Denver Airport aprons
    July 6, 2016
    Denver International Airport has awarded CH2M a contract for gate apron rehabilitation and drainage improvements. The three-year project encompasses professional engineering support and technical services for enhancements adjacent to concourses A, B and C. Included are pavement evaluations, replacement of deteriorating apron pavement, mitigation of apron drainage issues and ponding, as well as preventing water infiltration into concourse basements. Utility and infrastructure work includes installation
  • Kenya port suspension bridge project makes progress
    January 15, 2019
    A new suspension bridge in Kenya’s key port city, Mombasa, will help unlock potential – Shem Oirere reports Plans for the construction of a US$200 million suspension bridge in Kenya heva moved a notch higher. The country's urban roads agency recently announced the shortlisting of three bidders for the design, finance, construct, operate, maintain and transfer public private partnership (PPP) contract model. Kenya Urban Roads Authority (KURA) is a state agency that manages, develops, rehabilitates and mai
  • Work commencing on new bridge between Maine and New Hampshire
    January 12, 2015
    Work is now commencing in the US state of Maine for the new Sarah Mildred Long Bridge. The bridge will connect Maine and New Hampshire, spanning the Piscataqua River. The project is expected to cost around US$170 million, with $25 million coming from the US Department of Transport’s Transportation Investment Generating Economic Recovery (TIGER) grant programme. The existing bridge is 65 years old and is no longer suitable for the 14,000 vehicles/day it has to carry. The project is expected to be completed i