Skip to main content

Immersed tube Fehmarnbelt Tunnel approved

The Danish government has given its approval for the construction of the 18km immersed tube Fehmarnbelt Tunnel, which will connect the country with Germany.
February 21, 2012 Read time: 2 mins
An impression of the portal in Germany
The Danish government has given its approval for the construction of the 18km immersed tube Fehmarnbelt Tunnel, which will connect the country with Germany.

6801 Ramboll, in partnership with 1419 Arup and 1421 TEC, developed the detailed concept that has now won the go-ahead. The work was in cooperation with 1422 Wilkinson Eyre Architects, UK; 2890 SCHØNHERR, Denmark; 1425 WTM Engineers International, Germany; 1426 Oriental Consultants, Japan, 1427 TNO Defence, Security and Safety, The Netherlands; and 2893 HTG Ingenieurburo fur Bauwesen, Germany.

The original plans were for a road and rail bridge, but these have now been rejected on the basis that a tunnel is more environmentally friendly.

Scheduled to open for traffic in 2020, the tunnel link between the Danish island of Lollond and the German island of Fermarn is expected to cost €5.1 billion to build, with the majority of the work being paid for by the Danish government.

A four-lane motorway and two-track rail link will speed passengers through the tunnel in an estimated 7-10 minutes, as compared with the 45-minute ferry crossing available now.

Interest is likely to be strong among construction companies and contractors wanting to bid for portions of this massive project.

German construction company Johann-Bunte has revealed that it has already signed a joint venture agreement with a number of international partners to bid for the construction of the link. Other major industry players are expected to reveal their intentions in bidding for the project shortly.

Because of new safety legislation in Europe imposed following disastrous tunnel fires in Austria and Switzerland that led to major fatalities, this new project will also be equipped with the latest safety systems and technology.

Proposals have also been put forward for a new bridge in Denmark to connect the islands of Als and Funen at an estimated cost of some €2.68 billion.

Its construction has been suggested by 1434 Danfoss, the specialist manufacturer of hydraulic systems, which is a major industry in Denmark.

Should the bridge go ahead it would be financed partly by being a tolled link under the proposed scheme. Backers for the plan have yet to be found however and the plans remain at an early stage.

For more information on companies in this article

Related Content

  • EU funding tunnel safety investment for Maastricht
    January 21, 2013
    The new urban tunnel project under construction at Maastricht in the Netherlands will benefit from EU for key safety features. The European Union will provide co-financing of €5 million from the TEN-T Programme to install safety provisions for the on-going implementation of Maastricht’s E25/A2 urban highway tunnel. The work will help ensure the link features high standards of tunnel safety and security and meets the EU’s tough legislation. The project was selected for funding under the 2011 TEN-T Annual Cal
  • Mont Blanc Tunnel maintenance closure
    April 26, 2024
    The Mont Blanc Tunnel will be closed for maintenance.
  • The tunnel connecting Denmark and Germany will now be delayed
    May 2, 2012
    The company handling the Fehmarnbelt tunnel project that will connect Denmark and Germany has confirmed that the project will now be delayed. Femern has now revealed that construction will not start before summer 2015, a year later than originally planned. Denmark is expected to commence its environmental compatibility study in May 2013.
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop