Skip to main content

Historic bridge damaged in flood opens in UK

The official reopening of a bridge badly damaged in the Cumbria floods has taken place. Bouthrey bridge, just off the A5084 between Water Yeat and Nibthwaite in South Lakeland, was severely damaged by the some of the heaviest rainfall ever recorded in England in November 2009. A temporary bridge was constructed as an interim measure and work began on repairing the main bridge.
April 25, 2012 Read time: 2 mins
The official reopening of a bridge badly damaged in the Cumbria floods has taken place. Bouthrey bridge, just off the A5084 between Water Yeat and Nibthwaite in South Lakeland, was severely damaged by the some of the heaviest rainfall ever recorded in England in November 2009. A temporary bridge was constructed as an interim measure and work began on repairing the main bridge. The work has been funded by 5432 Department for Transport capital funding which was put in place immediately following the floods in 2009. The type of repair was chosen after consultation. The work was contracted to 2958 Amey and a local contractor Ian Shaw, while 2762 Capita Symonds designed the bridge. The requirement to work within 2759 Environment Agency timeframes and additional environmental considerations had to be factored into the planning process, as the bridge is a Grade II listed structure. The Environment Agency worked closely with the council and contractors to manage flood risk throughout the construction of the new bridge, as well as protecting the local environment. In addition the Environment Agency is continuing to work with communities across Cumbria to look at ways to reduce the risk of flooding. Following the opening of Bouthrey bridge, Workington’s Northside bridge, where work is ongoing to provide a replacement bridge by May 2012, will be the only key road bridge in Cumbria that was either destroyed or damaged in the 2009 floods that is still to be replaced. In the immediate flood aftermath 20 road bridges were closed. Bouthrey bridge was opened by Cumbria County Council’s chairman, John Woolley.

For more information on companies in this article

Related Content

  • Pothole damage to be repaired
    February 21, 2012
    Councils in England will be given more than £100 million (€e117 million) of extra funding to spend on repairing potholes, Transport Secretary Philip Hammond has said.
  • Chile's earthquake repairs
    February 29, 2012
    Earthquake repair works continue in Chile, with several bridges reopening and new links being constructed.
  • Capita Symonds wins key UK contract for traffic information
    April 4, 2012
    Capita Symonds’ Innovations has a new contract that forms part of the Highways Agency Traffic Information System (HATRIS) programme. The contract is an extension to the company’s current HATRIS work and will run until 12th December 2014. The HATRIS system has been developed and improved by Capita Symonds since 2005 and is used to monitor and report on vehicle journey times across set routes on the motorway and trunk road network. This enables the Highways Agency and Department for Transport to identify tren
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.