Skip to main content

Hamburg highway expansion programme

A €1.6 billion project is in hand in Germany to widen the A7 Autobahn between Bordesholm and Hamburg's tunnel Elbtunnel. Funding for the project is being provided jointly by the German Government, the city of Hamburg, the province of Schleswig-Holstein and the German engineering firm Deutsche Einheit Fernstraßenplanungs- und -bau (DEGES). The work should be complete by 2018. The project involves increasing the number of traffic lanes in the Schleswig-Holstein section from four to six and in Hamburg from six
May 20, 2015 Read time: 1 min
A €1.6 billion project is in hand in Germany to widen the A7 Autobahn between Bordesholm and Hamburg's tunnel Elbtunnel. Funding for the project is being provided jointly by the German Government, the city of Hamburg, the province of Schleswig-Holstein and the German engineering firm Deutsche Einheit Fernstraßenplanungs- und -bau (DEGES). The work should be complete by 2018. The project involves increasing the number of traffic lanes in the Schleswig-Holstein section from four to six and in Hamburg from six to eight, so as to boost capacity. Three bridges have already been removed, with a further three requiring demolition. The project will be the largest in the north of Germany once work is fully underway. This section of the A7 Autobahn is amongst the busiest routes in Germany.

Related Content

  • Davao City tunnel work accelerated
    November 18, 2022
    The twin-tube 2.3km-long tunnel will be the longest in the Philippines and is being constructed by Filipino and Japanese engineers.
  • South German road tunnel project to restart
    July 26, 2018
    Construction work on the Kramertunnel in South Germany is to restart. The tunnel is needed to help reduce traffic delays in the town of Garmisch-Partenkirchen in the southern German state of Bavaria and with lies next to the border with Austria. The twin tube tunnel stretches will both be around 2.8km long and the project will also include building six bridges as part of the new bypass around the town. The new bypass, with its tunnel and bridges, is required as traffic jams occur regularly in the town on th
  • Amsterdam tunnel widening project
    February 23, 2017
    In Amsterdam widening work is now underway on the A10 motorway project close to Zuidas. The project is expected to take 10 years in all to complete and is being carried out in a bid to cut congestion at peak periods. Costing €990 million, the work is being carried out by a consortium that comprises local firm Heijmans, US company Fluor and the German contractor Hochtief. The project was awarded to the consortium by the Dutch infrastructure board Rijkswatersaat, the local council of Amsterdam, the rail servi
  • Bay of Plenty turns costly
    July 25, 2022
    New Zealand’s Bay of Plenty highway projects have nearly doubled in cost.