Skip to main content

Germany’s A281 extension to include another Weser River tunnel

Work has started on a 5km extension, including a 1.1kkm tunnel under the Weser River, to Germany’s A281 motorway. The project around the northwestern city of Bremen will connect the A281 with the A27 by 2024 and cost around €345 million. Bremen will contribute €1 million.
January 21, 2019 Read time: 1 min

Work has started on a 5km extension, including a 1.1kkm tunnel under the Weser River, to Germany’s A281 motorway.

The project around the northwestern city of Bremen will connect the A281 with the A27 by 2024 and cost around €345 million. Bremen will contribute €1 million.

The first part of the A281 was opened in 1995 and eases traffic congestion heading to Bremen Airport Hans Koschnick.

The existing Weser Tunnel runs from the villages of Rodenkirchen and Dedesdorf, offering a connection between the cities of Nordenham and Bremerhaven. It was opened in 2004 and provides access to the A 27 motorway and the B 212.

Related Content

  • Germany plans replacement for A40 Neuenkamp Duisburg Bridge
    March 6, 2018
    Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg. The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.
  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.
  • Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway
    October 20, 2017
    Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.
  • Restart for Slovakia’s Čebrať tunnel and Hubova-to-Ivachnova D1 section
    December 13, 2017
    Work will restart on the 15.2km D1 bypass around the Slovakian town of Ružomberok after the government and contractors amended the contract. The consortium of OHL ZS and Vahostav-SK and the National Highway Company (NDS) recently signed and addendum to the contract that includes an extension of section’s Čebrať tunnel by1.6km to 3.6km and shortening of the road by around 300m. Because of continuing geological concern, NDS had earlier decided to reroute the road and the tunnel. As a result, the cost of the