Skip to main content

German highway tunnel project

The project to build the Riederwaldtunnel highway tunnel in Germany is now likely to cost €477 million. The project was originally expected to cost €322 million. The tunnel will stretch 1.1km and will provide a connection between the A66 and A661 routes. Construction work on the tunnel, located near the city of Frankfurt, is expected to commence in 2020.
February 7, 2019 Read time: 1 min

The project to build the Riederwaldtunnel highway tunnel in Germany is now likely to cost €477 million. The project was originally expected to cost €322 million. The tunnel will stretch 1.1km and will provide a connection between the A66 and A661 routes. Construction work on the tunnel, located near the city of Frankfurt, is expected to commence in 2020.

Related Content

  • Polish project tender attracts interest
    February 25, 2019
    Interest is strong in the contract to build a new stretch of expressway in the north of Poland. Nine bids have been made for the project to built a 17km stretch of the S16 expressway, which lies close to the Russian enclave of Kaliningrad. This section will connect Borki Wielke and Mragowo and the work also includes construction a bypass around the latter. The bids range in value from €164.4 million up to €234 million. Work is expected to commence in 2020 and take until 2023 to complete.
  • Iran-Armenia highway project agreed
    November 9, 2023
    A new Iran-Armenia highway project has been agreed.
  • Vietnam bridge, road and highway development projects
    June 20, 2018
    Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
  • Breakthrough for Slovenian Karavanke Tunnel
    April 2, 2024
    The existing tunnel Karavanke Tunnel tube between Austria and Slovenia opened in 1991.