Skip to main content

First deck span completed for Mersey Gateway's north approach viaduct

The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.
February 12, 2016 Read time: 2 mins

The 6126 Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed.

The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.

The MSS, which acts as a giant concrete mould, was specially designed for the Mersey Gateway Project. It is being used to build the two elevated approach viaducts over the Mersey estuary.

The span connects the beginning of the approach viaduct from the north abutment in Widnes to the first supporting pier. It measures around 60m long and 18m wide and is angled at 5 degrees to allow vehicles to travel safely around the curve of the approach road.

Construction teams worked around the clock to get the span ready. This involved pouring 1,146m3 of concrete into the MSS non-stop over 34 hours.


"This is a real achievement for the project and a milestone that we've been looking forward to with anticipation,” said Declan Cannar, Merseylink's general foreman in charge of the MSS operation. “We're now busy preparing the MSS so it's ready to cast the next section."

The approach viaduct deck is being constructed in three phases. The deck spans are constructed first by the MSS, then a deck slab is built on top of the span, and finally the outer deck or ‘wings' are built by a wing traveller machine to provide the full six lane width of the approach road.

The MSS has moved to its second casting position ready for work to begin on the next span, which will be cast in March.

View Trinity in action by clicking here.
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.merseygateway.co.uk/live-view Visit www.merseygateway.co.uk/live-view false http://www.merseygateway.co.uk/live-view false false%>

For more information on companies in this article

Related Content

  • Hamm extends H series at INTERMAT
    April 17, 2012
    With the market launch of the new H series, there are now five compactors including the H18i, H18iP, H20i, H20iP and H25i. These models have an operating weight of 18, 20 and 25 tonnes. The ‘i’ in the name stands for intelligent emission control and reflects the fact that these machines are powered by a future-proof internal combustion engine with ‘Tier 4’ technology. The frame construction and engine cover design provides an unobstructed view of the surface to be compacted. The operator spends his working
  • McKinsey to present major construction sector report at bauma
    March 3, 2016
    Consultancy McKinsey and Company will launch its report Perspectives on the Construction Equipment Industry in Europe during the upcoming bauma exhibition in Munich. The report will be presented at joint seminar with the CECE – Committee for European Construction Equipment – in the bauma fairgrounds on April 13 when leading McKinsey analysts and CECE officials discuss main trends and challenges facing manufactures and buyers of equipment.
  • On-highway regulations point to Scania off-highway emissions solution
    January 6, 2017
    Scania will be showing both Euro 6 engines for its on-highway truck range and Stage IIB/Tier 4 Final powerplants for off-highway use. The company will use both exhaust gas recirculation (EGR) and selective catalytic reduction (SCR) to meet the coming regulations, as with its current Stage IIIB solution. This means the fitting of a diesel oxidation catalyst (DOC) but no requirement for a DPF. Scania engines are currently in use in Terex and Doosan articulated haulers, along with a number of Terex crushing ma
  • On-highway regulations point to Scania off-highway emissions solution
    February 7, 2013
    Scania will be showing both Euro 6 engines for its on-highway truck range and Stage IIB/Tier 4 Final powerplants for off-highway use. The company will use both exhaust gas recirculation (EGR) and selective catalytic reduction (SCR) to meet the coming regulations, as with its current Stage IIIB solution. This means the fitting of a diesel oxidation catalyst (DOC) but no requirement for a DPF. Scania engines are currently in use in Terex and Doosan articulated haulers, along with a number of Terex crushing ma