Skip to main content

First deck span completed for Mersey Gateway's north approach viaduct

The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.
February 12, 2016 Read time: 2 mins

The 6126 Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed.

The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.

The MSS, which acts as a giant concrete mould, was specially designed for the Mersey Gateway Project. It is being used to build the two elevated approach viaducts over the Mersey estuary.

The span connects the beginning of the approach viaduct from the north abutment in Widnes to the first supporting pier. It measures around 60m long and 18m wide and is angled at 5 degrees to allow vehicles to travel safely around the curve of the approach road.

Construction teams worked around the clock to get the span ready. This involved pouring 1,146m3 of concrete into the MSS non-stop over 34 hours.


"This is a real achievement for the project and a milestone that we've been looking forward to with anticipation,” said Declan Cannar, Merseylink's general foreman in charge of the MSS operation. “We're now busy preparing the MSS so it's ready to cast the next section."

The approach viaduct deck is being constructed in three phases. The deck spans are constructed first by the MSS, then a deck slab is built on top of the span, and finally the outer deck or ‘wings' are built by a wing traveller machine to provide the full six lane width of the approach road.

The MSS has moved to its second casting position ready for work to begin on the next span, which will be cast in March.

View Trinity in action by clicking here.
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.merseygateway.co.uk/live-view Visit www.merseygateway.co.uk/live-view false http://www.merseygateway.co.uk/live-view false false%>

For more information on companies in this article

Related Content

  • Hitachi to place “greater emphasis” on local production focus – HCME president
    January 6, 2017
    Moriaki Kadoya, president and chief executive of Hitachi Construction Machinery Europe (HCME), says Hitachi Construction Machinery needs to place “greater emphasis” on establishing local production facilities as it bids to strengthen its market position. A subsidiary of the Hitachi Group, Hitachi Construction Machinery currently has 33 production sites worldwide – with 16, including its flagship production site near Tokyo, in Japan.
  • Hitachi to place “greater emphasis” on local production focus – HCME president
    February 26, 2013
    Moriaki Kadoya, president and chief executive of Hitachi Construction Machinery Europe (HCME), says Hitachi Construction Machinery needs to place “greater emphasis” on establishing local production facilities as it bids to strengthen its market position. A subsidiary of the Hitachi Group, Hitachi Construction Machinery currently has 33 production sites worldwide – with 16, including its flagship production site near Tokyo, in Japan.
  • Plan worth sticking too
    April 8, 2013
    Plan supplies turn-key plants for the manufacture of precast concrete elements for civil, industrial and commercial buildings. The company’s machinery and plants are designed and built with innovative and useful solutions to produce wall panels, columns, beams, roof elements, hollow-core slabs. Plan can also provide special bespoke products on request. The firm’s services also include installation and commissioning, factory design, electrical and mechanical design, operator training, and after-sales service
  • Put your foot down, get home early from the office this Friday
    June 4, 2015
    Many cities want to show off their tourist credentials by driving tour operators around well-maintained, scenic routes and even make a video to lure travellers. But sometimes it pays to take a somewhat different line, as the Californian city of San Francisco did in 2012. San Francisco’s hilly streets became a global image for the Pacific coast city after the 1968 Hollywood blockbuster movie Bullitt. The star Steve McQueen, driving a fastback Ford Mustang, pursued at breakneck speed the villain, who was d