Skip to main content

Final touches for Seattle’s SR520 floating bridge

Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge. The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest. It opened in April last year as a replacement for the original 50-year-old four-lane
November 21, 2017 Read time: 2 mins
Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge.

The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest.

It opened in April last year as a replacement for the original 50-year-old four-lane Evergreen Point Floating Bridge which was 40m shorter. The new US$751 million bridge has six lanes of traffic as well as a 4.26m-wide separate pedestrian and cycling path. Recent work includes trail railing and lighting, drainage systems and trail connections on land to enhance the safety and modality of the structure and connect it to a system of paths and trails in the surrounding area.

World Highways, in a key project report in 2014, reviewed construction of the toll bridge that floats on 77 concrete pontoons, compared to 33 for the original bridge. The longest pontoons are 109m and are 22.86m wide and 8.53m high. Among them are 21 of the heaviest, widest and deepest longitudinal pontoons ever built, each weighing nearly 10,000tonnes.

There are 54 supplemental pontoons allowing the structure to withstand winds of up to nearly 160kph and nearly 2m-high waves – estimated to occur in the Puget Sound area every 100 years.

The American Council of Engineering Companies (ACEC) recently bestowed the 2017 Grand Conceptor Award upon the bridge for being “the nation’s best overall engineering achievement”. The ACEC considered 162 projects from all over the world for the award. General engineering consultant on SR 520 project was HDR while Kiewit/General/Manson was the bridge’s design-builder. Lead design consultant was KPFF.

Related Content

  • Terex Roadbuilding up to bridge paving challenge
    April 23, 2013
    Taking on a major bridge project in Calgary, Alberta province, Canada prompted Mission, British Columbia-based Camwood Construction to reassess its practice of subcontracting deck paving works. Inside the Terex booth at World of Concrete 2012, representatives from Camwood met with Mike Rodriguez, district manager for Terex Roadbuilding, and discussed the Terex Bid-Well 4800 paver on display. “The 4800 was the size of machine we needed for the Calgary job,” said Camwood owner Jeremy Woodman. Tony Regina, Cam
  • New York’s new bridge opens
    September 10, 2018
    The second span of the New York’s new cable-stayed bridge has now been completed and has opened to traffic. The final span of the Governor Mario M Cuomo Bridge, which replaced the Tappan Zee Bridge, has now been opened to drivers. The opening was delayed slightly due to concerns over the state of a section of the old bridge, now being demolished. The new link was constructed by a joint venture headed by Fluor. With the new bridge opening, all four lanes of eastbound traffic shifted to the new second span. T
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b