Skip to main content

Femern opts for immersed tunnel for the Fehmarn Belt link

The company behind the proposed Fehmarn Belt link crossing the Baltic Sea between Denmark and Germany will create the link with an immersed tunnel, despite a new environmental survey showing that a drilled tunnel would be more environment-friendly.
September 18, 2013 Read time: 1 min
The company behind the proposed Fehmarn Belt link crossing the Baltic Sea between Denmark and Germany will create the link with an immersed tunnel, despite a new environmental survey showing that a drilled tunnel would be more environment-friendly.

4782 Femern say the survey shows that neither an immersed or drilled tunnel would have environmental consequences prohibiting approval in Denmark or Germany.

The immersed tunnel is also estimated to be €1.3 billion (DKK 9.7 billion) cheaper than a drilled tunnel.

Construction of the Fehmarn Belt link is due to begin in 2015, with completion earmarked for 2021. Crossing the Fehmarn Belt in the Baltic Sea, the 18km wide link will connect the German island of Fehmarn with the Danish island of Lolland.

For more information on companies in this article

Related Content

  • Zealand to gain from Fehmarn Belt tunnel
    July 2, 2021
    The number of commuters crossing the Fehmarn Belt, a Baltic Sea strait that separates a German island and a Danish island, could reach 1.2 million by 2030, notes a new report.
  • Fehmarn Belt Tunnel opening set for mid-2029
    August 16, 2024
    Around 1,500 tonnes of reinforcement for casting the concrete tunnel elements are produced weekly for the 17.6km Fehmarn Belt Tunnel that will connect the Danish island of Lolland with the German island of Fehmarn.
  • Denmark eyes Little Belt Fixed Link
    November 8, 2023
    The directorate is concerned that the so-called New Little Bridge, which opened in 1970, will suffer severe traffic congestion from 2030 onwards.
  • Plans in hand for Denmark-Germany tunnel link
    January 25, 2013
    The tender pre-selection process is underway for the new tunnel link that will connect Denmark with Germany. Danish state-owned company Femern said that interest is strong in the project to build the tunnel, which will run under the Baltic Sea. So far nine consortia comprising 24 companies in all are taking part in the tender pre-selection process. The Fehmarn Belt Fixed Link will feature an immersed tunnel and its construction is expected to cost some €5.5 billion. There are four main contracts including d