Skip to main content

England’s new Sunderland Bridge renamed Northern Spire

The new Sunderland Bridge - on track to open in the spring - was officially named Northern Spire during a recent event on the bridge. The official naming followed a week-long public vote in which 10,000 people chose their favourite name from an official list of three names. Northern Spire received almost half of the votes, according to bridge officials. The other names were Lumen Point (34% of votes) and The Prism which received 17%. The two-span cable-stayed bridge across the River Wear in northeast
December 12, 2017 Read time: 2 mins
New Heights: from Sunderland Bridge to Northern Spire

The new Sunderland Bridge - on track to open in the spring - was officially named Northern Spire during a recent event on the bridge.

The official naming followed a week-long public vote in which 10,000 people chose their favourite name from an official list of three names.

Northern Spire received almost half of the votes, according to bridge officials. The other names were Lumen Point (34% of votes) and The Prism which received 17%.
 
The two-span cable-stayed bridge across the River Wear in northeast England is around 105m high and supported by a single double pylon – resulting in the name chosen. The steel and concrete structure has four vehicle lanes, as well as dedicated cycle and pedestrian routes.

Work started on the bridge in May 2015. The structure is part of a strategic transport plan to link the port of Sunderland and Sunderland city centre with the A19 main road. The 336m steel and concrete bridge is part of 2.8km of new road layout.

“The crossing has been built to last at least 120 years [and] will definitely stand the test of time,” said Ryan Rogan, construction manager for Farrans Construction, part of a joint venture with Victor Buyck Steel Construction to deliver the project on behalf of Sunderland City Council.

Farrans Construction is civil engineering contractor across the UK and Ireland. Victor Buyck, based in Belgium, is a major structural steelwork contractor specialising in bridges. The FVB JV’s design team is led by Buro Happold Engineering and Roughan & O'Donovan, as well as independent checker Ramboll.

Victor Buyck spent a year fabricating the pylon at its canal-side yard in Ghent, Belgium. Apart from the 1,550tonnes tonnes of steel, around 550tonnes of concrete went into making the pylon that, because of its size, had to be constructed in the open air. It was barged across the often-treacherous North Sea to Sunderland.

World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 29953 0 link-external published a review World Highways review link false /categories/road-highway-structures/features/sunderlands-new-wear-crossing-takes-shape/ false false%> of the bridge’s progress earlier this year.

Related Content

  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b
  • New Wear Crossing cables fully installed and tensioned to 50%
    September 21, 2017
    Structural engineering company VSL International has installed all 28 cable stays of England’s New Wear Crossing and stressed them to 50% of their design load. The next stage of stressing the cables will happen next month and be to 100% of design load. This will allow the construction team to adjust and tension them just enough to lift the bridge deck off the blue steel temporary supports that were constructed in the river to take the weight of the structure.
  • Tenders open for England’s A66 northern trans-Pennine route
    October 31, 2019
    A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to Highways England. A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of
  • Tees Valley crossing project consultation nears an end
    May 9, 2019
    Public consultation is nearly closed for a possible new crossing across the River Tees in northern England that could cost upwards of €350 million. A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government. Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound an