Skip to main content

England’s A14 project River Great Ouse Viaduct completed

Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
February 28, 2019 Read time: 2 mins
The River Great Ouse Viaduct stretches for 0.8km

Construction of the biggest bridge in 8100 Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed.

The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line.

Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both directions.

Willie McCormick, construction director for the A14 project said the programme calls for 34 new bridges which will cater for around 85,000 vehicles a day along the bypass. “We’ve already opened nine of these to traffic, but around three-quarters of the work we are doing is off the existing road network and unseen to drivers,” he said. “We’re over half way through delivering the new A14.”

Around 64 pillars are needed to carry the viaduct over the River Ouse floodplain, each around 2m wide and embedded up to 30m in the ground. The pillars support the 17 spans of steel beams and concrete slabs which form the bridge deck. When the new A14 fully opens by December 2020, the bridge will help to reduce journey times on the road by up to 20 minutes.
 
Highways England said that working in an on-site prefabrication yard helped the team complete the viaduct structural work for €4.6 million less than anticipated by using more traditional methods. It also made it safer for the workforce with less time spent working at height.  

The A14 upgrade was the subject of a key project report in World Highways issue June 2018.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external http://www.worldhighways.com/categories/measurement-survey-design-software/features/upgrading-a-busy-a-road-link-in-the-uk/ false http://www.worldhighways.com/categories/measurement-survey-design-software/features/upgrading-a-busy-a-road-link-in-the-uk/ false false%>

For more information on companies in this article

Related Content

  • Armenia’s road safety problem is critical
    March 9, 2018
    Armenia is facing a crisis in road safety, according to the World Health Organisation (WHO). The rate of road traffic fatalities in Armenia is 18.3/100,000 population according to the WHO 2015 Global Status Report on Road Safety. This is the highest rate in any Eastern European or Caucasus country, and costs an estimated 4.62% of GDP/year. Establishing partnerships with local authorities is a vital step towards improving road safety, saving lives and developing the economy. EASST partner Poghos Shahinyan,
  • Improved soil compactors developed by BOMAG
    January 6, 2017
    Boppard based BOMAG is unveiling its new 5-8tonne class soil compactors, which are said to offer increased performance and lower running costs.
  • David Quarmby will be a keynote speaker at ERIC 2016 in Leeds
    July 26, 2016
    David Quarmby, one of the United Kingdom’s most influential and experienced highways and transport senior executives, has been confirmed as a keynote speaker at the European Roads Infrastructure Congress – ERIC 2016 - in the autumn. Quarmby has had a long career in policy, planning, management and research in UK transport, with 39 years’ board-level experience in government, public agencies and the private sector, including London Transport and the retail food giant Sainsbury’s. Most recently he has b
  • Palfinger launches 30m truck-mounted platform
    January 6, 2017
    Palfinger Platforms has replaced its TKA series access platform with the P300KS. Mounted on a 7.5 tonne truck chassis, the P300KS has a working height of 30m with a maximum outreach to the side or the back of 20.5m. The cage, which offers 540 degrees of rotation, has a maximum load of 350kg.