Skip to main content

England’s A14 project River Great Ouse Viaduct completed

Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
February 28, 2019 Read time: 2 mins
The River Great Ouse Viaduct stretches for 0.8km

Construction of the biggest bridge in 8100 Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed.

The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line.

Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both directions.

Willie McCormick, construction director for the A14 project said the programme calls for 34 new bridges which will cater for around 85,000 vehicles a day along the bypass. “We’ve already opened nine of these to traffic, but around three-quarters of the work we are doing is off the existing road network and unseen to drivers,” he said. “We’re over half way through delivering the new A14.”

Around 64 pillars are needed to carry the viaduct over the River Ouse floodplain, each around 2m wide and embedded up to 30m in the ground. The pillars support the 17 spans of steel beams and concrete slabs which form the bridge deck. When the new A14 fully opens by December 2020, the bridge will help to reduce journey times on the road by up to 20 minutes.
 
Highways England said that working in an on-site prefabrication yard helped the team complete the viaduct structural work for €4.6 million less than anticipated by using more traditional methods. It also made it safer for the workforce with less time spent working at height.  

The A14 upgrade was the subject of a key project report in World Highways issue June 2018.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external http://www.worldhighways.com/categories/measurement-survey-design-software/features/upgrading-a-busy-a-road-link-in-the-uk/ false http://www.worldhighways.com/categories/measurement-survey-design-software/features/upgrading-a-busy-a-road-link-in-the-uk/ false false%>

For more information on companies in this article

Related Content

  • Palfinger launches 30m truck-mounted platform
    April 19, 2012
    Palfinger Platforms has replaced its TKA series access platform with the P300KS. Mounted on a 7.5 tonne truck chassis, the P300KS has a working height of 30m with a maximum outreach to the side or the back of 20.5m. The cage, which offers 540 degrees of rotation, has a maximum load of 350kg.
  • VIDEO: People see red over white elephant of a blue bike lane
    November 1, 2016
    The Scottish roads authority has backpedalled on its recently improved cycle lane along a major route on the south-west coast, close to the city of Ayr.

    Amid local authority concerns over traffic congestion and one man’s media-grabbing protest, the cycle lane will now be ripped out – after being installed this summer.

    As the video shows, it is a protected wide lane, often painted blue. Cars appear to travel freely beside it.
  • Directive on road infrastructure safety management – to improve mobility safely
    September 12, 2018
    Better signs and more compliance leads to safer roads, says Christophe Nicodème, director general of the European Union Road Federation in the first of a regular new series of columns from ERF The Third Mobility Package launched by the European Commission represents the final piece of the “Europe on the Move Agenda” towards a modernisation of transport policy adapting to new decarbonisation and digitisation commitments. The package is composed of elements impacting various transport elements, among which
  • Video highlights junction risk
    December 18, 2013
    A new video clip produced by the authorities in the UK highlights the risks of misjudging vehicle distances and speeds when entering a busy highway from a slip road. Fortunately no-one was seriously hurt and an alert truck driver’s timely response averted a major incident.