Skip to main content

England’s A14 project River Great Ouse Viaduct completed

Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
February 28, 2019 Read time: 2 mins
The River Great Ouse Viaduct stretches for 0.8km

Construction of the biggest bridge in 8100 Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed.

The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line.

Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both directions.

Willie McCormick, construction director for the A14 project said the programme calls for 34 new bridges which will cater for around 85,000 vehicles a day along the bypass. “We’ve already opened nine of these to traffic, but around three-quarters of the work we are doing is off the existing road network and unseen to drivers,” he said. “We’re over half way through delivering the new A14.”

Around 64 pillars are needed to carry the viaduct over the River Ouse floodplain, each around 2m wide and embedded up to 30m in the ground. The pillars support the 17 spans of steel beams and concrete slabs which form the bridge deck. When the new A14 fully opens by December 2020, the bridge will help to reduce journey times on the road by up to 20 minutes.
 
Highways England said that working in an on-site prefabrication yard helped the team complete the viaduct structural work for €4.6 million less than anticipated by using more traditional methods. It also made it safer for the workforce with less time spent working at height.  

The A14 upgrade was the subject of a key project report in World Highways issue June 2018.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external http://www.worldhighways.com/categories/measurement-survey-design-software/features/upgrading-a-busy-a-road-link-in-the-uk/ false http://www.worldhighways.com/categories/measurement-survey-design-software/features/upgrading-a-busy-a-road-link-in-the-uk/ false false%>

For more information on companies in this article

Related Content

  • Sweden awards Smartroad Gotland and Electreon a test road in Visby
    April 17, 2019
    Swedish inductive road consortium Smartroad Gotland has won a contract to convert 1.6km of road around Visby into an electric vehicle demonstration bed. The award by Sweden’s government transport administration agency Trafikverket covers a route used by buses and is also popular with logistics vehicle drivers between Visby Airport and central Visby. The former Hanseatic city, with a population around 25,000, is on the island of Gotland and has been a UNESCO World Heritage Site since 1995. Visby joins
  • Buckets of innovation
    January 6, 2017
    The lower angle of Caterpillar Work Tools’ new line of buckets for the E-series Hydraulic Excavators are said to concentrate the power of the machine across a smaller surface, offering less resistance to the material flow into and around the bucket resulting in a smoother and faster dig cycle. In addition, ‘Tip forward’ - the tip position that opens up the mouth of the bucket and lengthens the floor - has been moved towards the operator. This is said to improve both material flow into the bucket and visibi
  • Buckets of innovation
    April 12, 2012
    The lower angle of Caterpillar Work Tools’ new line of buckets for the E-series Hydraulic Excavators are said to concentrate the power of the machine across a smaller surface, offering less resistance to the material flow into and around the bucket resulting in a smoother and faster dig cycle. In addition, ‘Tip forward’ - the tip position that opens up the mouth of the bucket and lengthens the floor - has been moved towards the operator. This is said to improve both material flow into the bucket and visibi
  • Highways Agency rebrands as part of its first five-year plan
    December 10, 2014
    The UK’s Highways Agency will rebrand as part of the organisation’s first five-year Strategic Business Plan to maintain England’s motorways and major A roads up to 2020. The plan for England’s strategic road network was developed response to the Road Investment Strategy published in early December. The UK government is getting set to make deliver the largest investment in roads since the 1970s and wants to make sure it gets value for money as well as nearly US$1.9 billion (£1.2 billion) of efficiency savin