Skip to main content

Ecuador bridge project planned

In Ecuador plans are being drawn up for a new bridge connecting Duran with the port city of Guayaquil. The bridge will span the Guayas River and is expected to cost US$800 million to build. The project had been proposed by the former administration but stalled and has now been revived by the current administration. The link would provide a new connection for Highway 40, cutting journey times considerably. The planned location for the new bridge has not so far been clarified.
October 16, 2017 Read time: 1 min

In Ecuador plans are being drawn up for a new bridge connecting Duran with the port city of Guayaquil. The bridge will span the Guayas River and is expected to cost US$800 million to build. The project had been proposed by the former administration but stalled and has now been revived by the current administration. The link would provide a new connection for Highway 40, cutting journey times considerably. The planned location for the new bridge has not so far been clarified.

Related Content

  • Colombia continues tunnel plans
    February 17, 2012
    With work on Colombia's first La Linea tunnel still incomplete, discussions are now being held regarding plans for the second tunnel.
  • Delays have hit Chile’s Chacao Bridge project
    August 28, 2013
    Delays now look likely to affect the construction programme for Chile’s Chacao Bridge project. The US$740 million bridge project, long in planning, has been delayed on previous occasions for a number of reasons. The tolled link will connect Chiloé Island with the Chilean mainland in its Region X once complete. This 2.6km link will become South America’s largest suspension bridge although its opening will reduce journey times considerably over 25-45 minutes taken by the ferries used at present to link with C
  • Bangladesh steel bridge planned
    September 2, 2021
    A new steel bridge is being planned for Bangladesh.
  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.