Skip to main content

EC approves Slovakian highway project

The EC has given its approval for funding to construct the section of the D1 highway that will connect Hubova with Ivachnova. The EC will provide €169.2 million for the project. In all the 15.3km section of the highway will cost €227.26 million to construct, with the remainder being provided by the state budget. The construction is being carried out by a consortium combining Czech company OHL ZS and Slovak firm Vahostav SK. The work is now underway and the highway is expected to be open to traffic by June 2
March 23, 2015 Read time: 1 min
The EC has given its approval for funding to construct the section of the D1 highway that will connect Hubova with Ivachnova. The EC will provide €169.2 million for the project. In all the 15.3km section of the highway will cost €227.26 million to construct, with the remainder being provided by the state budget. The construction is being carried out by a consortium combining Czech company OHL ZS and Slovak firm Vahostav SK. The work is now underway and the highway is expected to be open to traffic by June 2017.

Related Content

  • Restart for Slovakia’s Čebrať tunnel and Hubova-to-Ivachnova D1 section
    December 13, 2017
    Work will restart on the 15.2km D1 bypass around the Slovakian town of Ružomberok after the government and contractors amended the contract. The consortium of OHL ZS and Vahostav-SK and the National Highway Company (NDS) recently signed and addendum to the contract that includes an extension of section’s Čebrať tunnel by1.6km to 3.6km and shortening of the road by around 300m. Because of continuing geological concern, NDS had earlier decided to reroute the road and the tunnel. As a result, the cost of the
  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th
  • Go-ahead for controversial highway
    May 30, 2012
    APPROVAL HAS now been given for work to go ahead on a key section of Slovakia’s D1 highway. The work had been delayed as the European Commission (EC) was concerned over environmental issues facing sections of the route that passed through a nature reserve. The EC has now given its approval for construction of the highway between Martin and Presov on conditional terms. The EC says that the sections in zones belonging to the Natura 2000 network can be built once terms are agreed with the Slovak government o
  • Slovakia’s D1 highway project underway
    August 11, 2022
    Work on Slovakia’s D1 highway project is underway.