Skip to main content

Drainage for new Wear Crossing in UK

In the UK the Lanes Group is carrying out the contract to build specialist drainage for the New Wear Bridge in Sunderland. The Lanes Group will carry out this work for the joint venture partners building the new bridge link.
January 21, 2016 Read time: 2 mins
The new Wear bridge will improve transport connections around Sunderland
RSSIn the UK the 7891 Lanes Group is carrying out the contract to build specialist drainage for the New Wear Bridge in Sunderland. The Lanes Group will carry out this work for the joint venture partners building the new bridge link.

Personnel based at the Lanes depot in Newcastle have begun carrying out drainage work for the €152.7 million (£117.6 million) bridge project. This is the second major bridge building project Lanes Group has been contracted to work on in recent months. The company is also providing specialist drainage support for the Mersey Gateway Project, the new bridge spanning the River Mersey between Runcorn and Widnes.

The New Wear Bridge is being built across the River Wear between the districts of Wessington and Pallion, and is designed to improve transport links between Sunderland city centre, the Port of Sunderland, the A19 and the wider region.

The three-span cable stay bridge, which is due to open in spring 2018, will also open up new development sites at either end. Lanes Group won a competitive tender to become the sole drainage contractor for the joint venture partners, Farrans Construction and Victor Buyck Steel Construction. Tasks already carried out by personnel from Lanes include desilting drainage pipes and carrying out CCTV drainage surveys.

The New Wear Bridge will be 336m long and will have a central A-frame cable pylon rising to 105m.

For more information on companies in this article

Related Content

  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • 12D for Christchurch
    June 12, 2012
    Australia's increasingly popular 12D Model software package for road design, terrain modelling, surveying and drainage has been selected as the main design and survey tool for the coordinated earthquake rebuild of Christchurch in New Zealand The 12D Model software will be the common platform for a group of consultants and contractors making up the recently formed SCIRT, standing for "Stronger Christchurch Infrastructure Rebuild Team". They will use it for survey, repair and rebuild of both the road netwo
  • Work commencing on a new highway in Algeria
    July 8, 2014
    Work is now underway on Algeria’s new 62km highway in Batna. The project was opened officially by the Algerian president. The US$567 million project will connect with Algeria’s key East-West highway and forms part of the president's 2005-2025 programme of works. The first section of the new highway will be split into two lots, linking the provinces of Batna, Khenchela and Oum El Bouaghi.
  • Controversial Russian bridge opens
    May 16, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link opening to use by cars. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Kamaz truck to reach the city of Kerch. The US$2.7 billion bridge forms part of