Skip to main content

Dragados among six in the running for fourth Panama bridge deal

All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports. The companies officially vying for the estimated US$1 billion contract are: • Dragados • Consorcio CCB: Constructora Norberto Odebrecht, Odebrecht Engenharia e Construcao International • Consorcio Hyundai, Sacyr JV • Consorcio Astaldi – Daelim • Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engi
August 23, 2016 Read time: 3 mins
All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports.

The companies officially vying for the estimated US$1 billion contract are:

•    4761 Dragados

•    Consorcio CCB: Constructora Norberto 1305 Odebrecht, Odebrecht Engenharia e Construcao International

•    Consorcio 236 Hyundai, 3959 Sacyr JV

•    Consorcio 1324 Astaldi – 3088 Daelim

•    Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engineering Company

•    Consorcio Cuarto Puente CSCEC – CREC – GLF:  5711 China State Construction Engineering Corporation, 890 China Railway Group

The bridge is likely to carry six vehicle lanes and two for a Panama metro rail link.

President Juan Carlos Varela Rodríguez announced the intention to build a fourth bridge in February last year. Varela also said the government would move to expand to eight lanes the highway between the Bridge of the Americas and the district and town of Arraiján.

In June the government appointed the US engineering firm T.Y Lin International to start project managing construction of the fourth bridge. Lin had won an international tender for the work likely to cost around US$17 million. The announcement came just ahead of the opening by the Panama Canal Expansion authorities of a major project that widened the canal to allow canal use by ships with cargo capacity of up 20 TEU.

The first crossing to have been built is the Bridge of the Americas that spans the Pacific Ocean entrance to the canal. The bridge was designed by 5750 Sverdrup & Parcel and finished in 1962 at a cost of $20 million.

The second crossing, the Centennial Bridge, is also on the Pacific end of the canal and was opened in 2004 in an effort to ease congestion on the Bridge of the Americas. It also replaces it as part of the Pan-American Highway.

The third bridge over the Panama Canal, known as the Atlantic Bridge, is under construction in Colón and spans the Atlantic entrance to the Canal. The bridge was designed by China Communication Construction Company, consisting of HPDI and 1493 Louis Berger Group. Construction was started in January 2013 by the French company 3085 Vinci Construction Grands Projets and the bridge is expected to open later this year.

The Atlantic Bridge will be located 3 km north of the Gatun locks, near the city of Colon. The contract covers construction of a 1,050m cable-stayed concrete bridge carrying two lines of traffic in each direction, with a central span of 530m and pylons with a height of 212.5m. It will have a clearance of 75m above the canal. The Atlantic Bridge will be the longest concrete cable stayed bridge in the world with a central span of 530m, according to Vinci.

For more information on companies in this article

Related Content

  • Ramboll appointed independent engineer on Champlain Bridge Project
    September 8, 2015
    Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada. Ramboll, based in Denmark, will work with the Canadian consultant Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America. Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion. “The ne
  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Panama’s projected plans for infrastructure
    July 3, 2015
    Panama’s Ministry of Public Works (MOP) is spending some US$2.96 billion during its present administration on infrastructure projects. These include the construction of a fourth bridge over the Panama Canal, which will link the Albrook district and the North Corridor. There are four road widening projects planned. The link between the Las Americas bridge and Arraijan will be expanded to eight lanes and the Panamericana road between La Chorrera and San Carlos will be expanded to six lanes. The Omar Torrijos