Skip to main content

Design contract awarded for Indian bridge project

A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around
March 26, 2018 Read time: 2 mins

A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA)

The 22km link will be India's longest sea bridge and is expected to cost around US$2.31 billion to construct. This contract will include monitoring services during building, with work on the project expected to last from mid-2018 until late 2022. 

The bridge forms part of India's increased focus on building infrastructure to support the country's rapid economic growth. The link will cut travel time between Mumbai and Navi Mumbai by one hour and will also connect Nhava Sheva Port, the Mumbai-Goa Highway, the Mumbai-Pune Expressway and the Navi Mumbai International Airport, currently under construction. 

The bridge will traverse the Sewri Mudflats, Pir Pau Jetty and Thane Creek channels. In a first for India, the project will include orthotropic steel deck sections, crossing several navigation channels. 

Work is expected to start this month with an estimated construction time of around 40 months. COWI provided the tender design for a contractor joint venture consisting of Larsen & Toubro Ltd (L&T) from India and IHI from Japan. In 2017, the L&T-IHI JV was awarded the Design-Build contract for Package 1 of the project - the longest of the three packages. The Package 1 section of the project consists of an interchange connecting to the existing Eastern Highway in Mumbai and a combination of concrete box girder bridges and orthotropic steel box girder bridges. 

MMRDA has awarded contracts to a consortium of Larsen and Toubro (L&T) and Japan's IHI Corporation, a consortium of Daweoo and Tata Projects Limited (TPL), and L&T to construct the Sewri side of sea bridge (Package 1), the Navi Mumbai side of sea bridge (Package 2), and the bridge portion on land towards Chirle (Package 3), respectively.
 

Related Content

  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • New Clyde bridge project
    March 12, 2021
    A New Clyde bridge project is going ahead.
  • BAM wins motorway deals in The Hague and Munich
    December 7, 2015
    The Dutch city of The Hague has awarded a BAM joint venture with a €300 million design, construction and maintenance contract for a 4km city road. The new connecting road will run between the motorway at the Ypenburg interchange, A4 and A13, and The Hague’s Central Zone of Binckhorst-Centrum-Scheveningen. Construction will start in mid-2016 and the road is expected to be open by early 2020. The Rotterdamsebaan will make The Hague and its immediate region better accessible by connecting the A4 /A13
  • Italian JV wins Denmark’s Storstrom Bridge construction deal
    October 27, 2017
    An Italian joint venture has won the construction contract for Denmark’s replacement 4km-long road and rail Storstrom Bridge. The Danish Road Directorate – Vejdirektoratet - awarded the work to contractors Itinera, Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €280 million for the 26m-wide single-support cable-stay structure. The European Union will subsidise the work to around €15 million.