Skip to main content

Denmark: construction of Storstrøm Bridge officially gets underway

Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge. The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937. The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.
September 27, 2018 Read time: 2 mins
Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge.


The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937.

The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.

Earlier this year the 2284 Danish Road Directorate - Vejdirektoratet - awarded the construction contract to an Italian joint venture of Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. The European Union will subsidise the work to around €15 million.

Danish civil engineering and infrastructure group Cowi was appointed as main design consultant in September 2016. Civil engineering and architectural firm Dissing+Weitling worked closely with Hasløv & Kjærsgaard, another Danish architecture studio, on design options.

The design is that of a “robust and simple structure” but which also appears “elegant and simple for those crossing or viewing the bridge”, according to Dissing+Weitling, the architectural firm involved in the project. The pier’s geometrical form complements the other bridges in the region, which include the Øresund Fixed Link, the Great Belt Link and the Farø Bridge.

For more information on companies in this article

Related Content

  • Interchange project wins major engineering award
    December 11, 2015
    The Section 5 Palmetto SR826/836 Interchange project in Florida has won the 2016 FICE Engineering Excellence Grand Award in the Structures category.
  • Cats eyes from Clearview set the tone at Switch Island in the UK
    February 23, 2018
    Cats eyes, which light up in response to changing traffic lights, will be used for the first time in the UK at a motorway junction. Highways England, the government agency, is installing around 170 of the LED road studs at Switch Island, one of England’s busiest motorway junctions – used by over 90,000 vehicles every day. Installation is expected to take around a year to complete.
  • Plans in hand for Denmark-Germany tunnel link
    January 25, 2013
    The tender pre-selection process is underway for the new tunnel link that will connect Denmark with Germany. Danish state-owned company Femern said that interest is strong in the project to build the tunnel, which will run under the Baltic Sea. So far nine consortia comprising 24 companies in all are taking part in the tender pre-selection process. The Fehmarn Belt Fixed Link will feature an immersed tunnel and its construction is expected to cost some €5.5 billion. There are four main contracts including d
  • New structure for A46 bypass
    January 10, 2025
    A new concrete structure is being built for the UK’s A46 bypass.