Skip to main content

Demolition of overpass carried out in Chicago

A successful bridge demolition project has been carried out in Chicago Illinois. The work to remove the Ontario Street Bridge was carried out on behalf of the Illinois Department of Transportation. A fleet of Caterpillar excavators was used for the work. The machines featured demolition attachments, allowing the structure to be removed in a controlled fashion as the video reveals.
June 23, 2014 Read time: 1 min
A successful bridge demolition project has been carried out in Chicago Illinois. The work to remove the Ontario Street Bridge was carried out on behalf of the 6168 Illinois Department of Transportation. A fleet of 178 Caterpillar excavators was used for the work. The machines featured demolition attachments, allowing the structure to be removed in a controlled fashion as the video reveals.

For more information on companies in this article

Related Content

  • US$1.7 billion Francis Scott Key Bridge replacement design
    February 6, 2025
    The design of the US$1.7 billion Francis Scott Key Bridge replacement is revealed.
  • Bridging the gap in African infrastructure
    December 20, 2013
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia.
  • Efficient highway bridge demolition with breakers
    July 16, 2013
    As this video clip shows, efficient bridge demolition work has a lot to do with effective planning. Bringing down this defunct bridge over a busy highway called for careful planning so as to minimise traffic disruption. Proper preparation allowed engineers to make the site ready for a closure of the highway, with the bridge then being brought down within a tight timeframe. Having sufficient excavators fitted with hydraulic breakers was a key component in ensuring that the work could be carried out in time,
  • Breakers building underground carpark in Qatar
    June 20, 2016
    A fleet of Rammer breakers is being used to help build a new underground car park in Qatar The underground car park will be for a dentistry and dermatology clinic in the capital, Doha. Hydraulic hammers being mentioned at the same time as a dental surgery is often associated with pain, discomfort and general unpleasantness. This is not the case in Doha, the capital of Qatar, as Rammer hammers are being used to spearhead the creation of an underground car park at a dentistry and dermatology clinic.