Skip to main content

Demolition of overpass carried out in Chicago

A successful bridge demolition project has been carried out in Chicago Illinois. The work to remove the Ontario Street Bridge was carried out on behalf of the Illinois Department of Transportation. A fleet of Caterpillar excavators was used for the work. The machines featured demolition attachments, allowing the structure to be removed in a controlled fashion as the video reveals.
June 23, 2014 Read time: 1 min
A successful bridge demolition project has been carried out in Chicago Illinois. The work to remove the Ontario Street Bridge was carried out on behalf of the 6168 Illinois Department of Transportation. A fleet of 178 Caterpillar excavators was used for the work. The machines featured demolition attachments, allowing the structure to be removed in a controlled fashion as the video reveals.

For more information on companies in this article

Related Content

  • Rapid adoption of GPS machine control
    February 10, 2012
    The high sophistication of GPS machine control systems has resulted in a fast pace of technological advancement. The three major players in the machine control sector, Leica Geosystems, Topcon and Trimble have all made major gains in recent years. The sophistication of the latest systems can combine satellite position data from the GPS and GLONASS networks with information from total stations to provide precise, high speed machine operation. Further more the firms have also prepared themselves for the intro
  • Komatsu's demolition tools
    February 22, 2012
    Komatsu now offers excavators specifically configured for demolition work, with short tail machines featuring a level II Operator Protective Guard (OPG).
  • Ageing Liberty Tunnels in US refurbished with hydrodemolition
    May 13, 2015
    Hydrodemolition surface preparation keeps Liberty Tunnel rehabilitation project on schedule in Pittsburgh. The Pennsylvania state Department of Transportation selected hydrodemolition surface preparation for the US$18.8 million rehabilitation of Pittsburgh’s Liberty Tunnels. Time was of the essence to complete the project on deadline without penalties and hydrodemolition was selected as it offered a fast and cost-effective method to prepare the tunnel walls for a new, shotcrete surface. This methods off
  • Recycling used for German road expansion project
    April 20, 2018
    A milling machine from Bomag has been carrying out an important portion of the work needed for a four-lane expansion of a busy route in Southern Germany Widening work has been carried out on the B85 route from Amberg to Pittersberg in Bavaria to boost its capacity. The 2.6km section was prioritised as being in urgent need of improvement by the Federal transport Ministry. Construction work commenced in mid-2017, starting with preparation works and the project includes a cloverleaf interchange to connect t