Skip to main content

Demolition of overpass carried out in Chicago

A successful bridge demolition project has been carried out in Chicago Illinois. The work to remove the Ontario Street Bridge was carried out on behalf of the Illinois Department of Transportation. A fleet of Caterpillar excavators was used for the work. The machines featured demolition attachments, allowing the structure to be removed in a controlled fashion as the video reveals.
June 23, 2014 Read time: 1 min
A successful bridge demolition project has been carried out in Chicago Illinois. The work to remove the Ontario Street Bridge was carried out on behalf of the 6168 Illinois Department of Transportation. A fleet of 178 Caterpillar excavators was used for the work. The machines featured demolition attachments, allowing the structure to be removed in a controlled fashion as the video reveals.

For more information on companies in this article

Related Content

  • Controlled demolition development
    January 25, 2017
    The development of reliable hydraulic attachments has brought a revolution in demolition technology. The hydraulic breaker, pioneered by the Krupp and Montabert brands, has firmly taken hold with a huge range of manufacturers now offering machines. Hydraulic attachment specialists such as Atlas Copco, Indeco and Sandvik (with its Rammer brand) now offer a range of tools that can deliver high efficiency and safety in demolition work. Meanwhile, developments with smaller tools offer productive methods for rep
  • Chicago’s expressway upgrade underway
    April 5, 2023
    Work is now underway on Chicago’s Kennedy Expressway upgrade project.
  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • High speed bridge demolition minimises disruption
    February 16, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.