Skip to main content

Deals signed to construct Polish highway project

Construction of a stretch of the S7 dual carriageway in Poland will commence shortly following the signing of contracts for the work. The stretch, connecting Lotnisko junction with Grojec's ring road, will cost €186.66 million to build. Three contracts were awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA) for the work. Rubau Polska will build a 7km section while a 14.8km stretch will be built by IDS-Bud and Mota-Engil Central Europe will build an 8km portion of the link.
August 22, 2017 Read time: 1 min

Construction of a stretch of the S7 dual carriageway in Poland will commence shortly following the signing of contracts for the work. The stretch, connecting Lotnisko junction with Grojec's ring road, will cost €186.66 million to build. Three contracts were awarded by the 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) for the work. Rubau Polska will build a 7km section while a 14.8km stretch will be built by IDS-Bud and Mota-Engil Central Europe will build an 8km portion of the link.

For more information on companies in this article

Related Content

  • EIB lends €900mn for Poland’s S7 and S8 dual carriageways
    December 14, 2012
    Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the European Investment Bank (EIB). The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • New US$341.2mn Polish motorway construction contract awarded to Impreglio
    February 6, 2013
    Italian civil engineering company Impregilo, through Poland-based subsidiary Salini Polska, and Polish firm Kobylarnia has been awarded a US$341.2 million (€250mn) contract to build a stretch of Poland’s A1 motorway. The near 75km route will link the towns of Torun and Strykow, and is expected to be completed within a year.
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the