Skip to main content

Damaged Norwegian bridge undergoes successful demolition

A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to
February 23, 2015 Read time: 2 mins
A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to 8006 Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to remove the damaged structure instead.

The collapse of the structure has prompted questions as to the safety of other bridges in Norway and it has since transpired that checks carried out previously may have been insufficient. The slippage that spelled the fate of the Skjeggestad Bridge was related to the presence of a type clay, which can become unstable when under stress and in the presence of water.

For more information, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 20623 0 oLinkInternal visit this page Norwegian bridge collapse prompts further investigations false /categories/road-highway-structures/news/norwegian-bridge-collapse-prompts-further-investigations/ false false%>

For more information on companies in this article

Related Content

  • First-time exhibitor CMS Cepcor to display replacement crusher spare parts/crusher liners
    March 11, 2013
    First-time exhibitor CMS Cepcor will exhibit its range of replacement crusher spare parts and premium crusher liners at bauma 2013. Recently awarded the Queen’s Award for Outstanding Achievement in International Trade, CMS Cepcor currently exports to over 100 countries. Despite the worldwide economic recession and credit crisis, the company says its sales turnover increased by over 100% since 2010. “This growth has been achieved through a focus on optimisation of web presence together with an engineering f
  • Simex exports secrets behind company success
    January 6, 2017
    With a production of some 2,000 units in 2012 subdivided into 65 models produced in more than 210 versions, Simex today exports about 80% of its own production. Born in 1991 in San Giovanni in Persiceto, Emilia Romagna, the company soon set about achieving its goal of manufacturing high quality equipment for earth moving prime movers. Starting with asphalt planers for backhoe loaders, asphalt and concrete planers were soon manufactured by Simex for skid steer loaders too.
  • Simex exports secrets behind company success
    April 8, 2013
    With a production of some 2,000 units in 2012 subdivided into 65 models produced in more than 210 versions, Simex today exports about 80% of its own production. Born in 1991 in San Giovanni in Persiceto, Emilia Romagna, the company soon set about achieving its goal of manufacturing high quality equipment for earth moving prime movers. Starting with asphalt planers for backhoe loaders, asphalt and concrete planers were soon manufactured by Simex for skid steer loaders too.
  • Kosovo motorway wins IRF award
    May 30, 2013
    Kosovo’s Route 7 Motorway is an 84km dual carriage motorway that will span Kosovo from the southwest border with Albania to the capital city of Pristina, tying the heart of Kosovo to the Albanian port city of Durres. This motorway is part of the pan-European motorway network for Southeast Europe and provides a key trade corridor. In November 2011, Bechtel-Enka General Partnership (BEGP) successfully delivered 38km to the people of Kosovo, only 19 months after the contract award. The second main achievement