Skip to main content

Damaged Norwegian bridge undergoes successful demolition

A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to
February 23, 2015 Read time: 2 mins
A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to 8006 Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to remove the damaged structure instead.

The collapse of the structure has prompted questions as to the safety of other bridges in Norway and it has since transpired that checks carried out previously may have been insufficient. The slippage that spelled the fate of the Skjeggestad Bridge was related to the presence of a type clay, which can become unstable when under stress and in the presence of water.

For more information, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 20623 0 oLinkInternal visit this page Norwegian bridge collapse prompts further investigations false /categories/road-highway-structures/news/norwegian-bridge-collapse-prompts-further-investigations/ false false%>

For more information on companies in this article

Related Content

  • More efficient ground stabilisation with the Allu 3D Positioning System
    April 19, 2013
    The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
  • myPERI online portal presented in detail for first time during bauma
    January 6, 2017
    myPERI online portal will be presented in detail at a major construction equipment industry trade show for the first time during bauma. It gives customers of the internationally-renowned German formwork solution company round-the-clock access to extensive technical information and specific project data for their PERI construction sites. Project-specific reports, which offer, principally, a detailed overview of material stocks and flows, are said to be particularly advantageous for construction work.
  • myPERI online portal presented in detail for first time during bauma
    February 13, 2013
    myPERI online portal will be presented in detail at a major construction equipment industry trade show for the first time during bauma. It gives customers of the internationally-renowned German formwork solution company round-the-clock access to extensive technical information and specific project data for their PERI construction sites. Project-specific reports, which offer, principally, a detailed overview of material stocks and flows, are said to be particularly advantageous for construction work.
  • Fraccaroli & Balzan targets large quarries with its new filter press
    January 6, 2017
    Fraccaroli & Balzan, which designs, manufactures and installs waste water treatment systems, is showcasing its biggest filter press yet at bauma 2013. Previously the Italian firm only made lateral beam-type filter presses, which can only go up to a certain size and capacity. Now Fraccaroli & Balzan has developed high beam filter presses, which can be much larger and designed for quarries that need to process high volumes of material. “This filter press is for big quarries with big production that prefer to