Skip to main content

Czech tunnel link proposed as alternative

A new road tunnel link has been proposed for the town of Bilina in the Czech Republic. The project has been put forward by the country’s state road and motorway management company RSD as an alternative to the bypass originally proposed. At present the E442 route passes straight through Bilina, which is located in the north of the country and close to the border with Germany. However the road link is not considered suitable and a bypass costing an estimated €252.15 million was suggested as a way to carry tra
November 11, 2019 Read time: 1 min

A new road tunnel link has been proposed for the town of Bilina in the Czech Republic. The project has been put forward by the country’s state road and motorway management company RSD as an alternative to the bypass originally proposed. At present the E442 route passes straight through Bilina, which is located in the north of the country and close to the border with Germany. However the road link is not considered suitable and a bypass costing an estimated €252.15 million was suggested as a way to carry traffic around the town. The 1.3km tunnel has been suggested instead as it is thought to be around half the cost of the bypass. However the project still has to receive approval from the Transport Ministry as well as other necessary regulatory approvals.

Related Content

  • Work to start on Fehmarn Belt link to start in autumn
    April 4, 2019
    Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government. Danish company Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland. An autumn start wou
  • Restart for Slovakia’s Čebrať tunnel and Hubova-to-Ivachnova D1 section
    December 13, 2017
    Work will restart on the 15.2km D1 bypass around the Slovakian town of Ružomberok after the government and contractors amended the contract. The consortium of OHL ZS and Vahostav-SK and the National Highway Company (NDS) recently signed and addendum to the contract that includes an extension of section’s Čebrať tunnel by1.6km to 3.6km and shortening of the road by around 300m. Because of continuing geological concern, NDS had earlier decided to reroute the road and the tunnel. As a result, the cost of the
  • Czech Republic re-tenders D4 Pribram and Pisek section as P3 deal
    January 6, 2017
    The Czech Transport Ministry has re-tendered for legal, technical and financial consultancy services regarding the first public-private partnership for a road project. The contract is for construction of a 32km section of the D4 motorway between Pribram and Pisek in South Bohemia. A previous tender for the €3.8 million project was cancelled by the Czech Anti-monopoly Office (UOHS) that suggested it contained flaws. Deadline for bids for the new tender is February 15 with construction of the remaini
  • Just stop arguing and build the thing
    December 15, 2017
    The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate. The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy. Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeologi