Skip to main content

Czech highway deal for consortium partners

A consortium has won a package of works to construct a section of the D35 highway in the Czech Republic. The 12.6km stretch of the D35 highway lies between Opatovice and Časy and the project has a contract value of €132 million, with the work expected to take 44 months to complete. The consortium is headed by Austrian contractor STRABAG with a 41% stake in the deal and also includes the Czech firms Silnice and SMP CZ. This new four-lane link will feature two interchanges. The D35 is part of the northern
February 5, 2019 Read time: 2 mins
A consortium has won a package of works to construct a section of the D35 highway in the Czech Republic. The 12.6km stretch of the D35 highway lies between Opatovice and Časy and the project has a contract value of €132 million, with the work expected to take  44 months to complete. The consortium is headed by Austrian contractor 945 STRABAG with a 41% stake in the deal and also includes the Czech firms Silnice and SMP CZ.


This new four-lane link will feature two interchanges. The D35 is part of the northern route linking Bohemia and Moravia and is intended to serve as an alternative route to the D1 highway.

The contract includes building 25 bridges. Of these, seven bridges will cross above the highway, while the remaining 18 form part of the route itself. The largest bridge is a 1,060m-long overpass spanning the Elbe River and its floodplain area. Seven noise abatement walls also form part of the contract.

For more information on companies in this article

Related Content

  • Czech tenders for D6 section near Karlovy Vary
    June 7, 2023
    The Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.
  • Checking up on the Czech Republic's Via Salis
    May 20, 2022
    Construction of the Via Salis, the Czech Republic’s first public-private partnership for a road project, is on schedule, according to VINCI which is leading the construction and operating consortium.
  • Four consortia head to second round Czech D4 tender
    November 23, 2018
    Czech Transport Ministry has advanced four out of seven consortia for a €975 million D4 motorway contract between Příbram to Písek. When signed, the 32km 25-year design-build-finance-operate contract will be the first of what the Czech government hopes will be more public-private partnerships. A Vinci-led consortium is one of the chosen groups, consisting of Vinci Highways, Vinci Concessiones and Meridiam Investments of France. Another is a German-Austrian group of Strabag and Hochtief. The third i
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the