Skip to main content

Czech bypass project faces delay

An important Czech bypass project is facing delays.
By MJ Woof September 18, 2020 Read time: 1 min
An important bypass project in the Czech Republic is now facing delays - image © courtesy of Artof Sha, Dreamstime.com
Delays are now affecting construction work for the Czech Republic’s Ceske Budejovice bypass project. As a result, the bypass will not be ready for traffic until 2024.

Geological problems in the Pohurka Tunnel are at the heart of the delays. Dealing with unexpectedly high levels of groundwater will add around €3.88 million to the project. In all, the project is costing around 204.9 million.

Related Content

  • Russian road project faces delays
    November 30, 2021
    A key Russian road project faces delays.
  • Tunnel delays in Czech link
    February 27, 2012
    Drilling work on the Blanka road tunnel in Czech capital Prague has now been completed.
  • Taiwan road contract faces delays
    October 9, 2015
    The 38.8km improvement project for Taiwan’s Suhua Highway now looks to be delayed until 2019. The opening of the route is being delayed by a combination of factors including landslides and archeological discoveries. The improvement works include upgrades to a number of key bridges and mountain tunnels like sections from Suao to Dongao, Nanao to Heping and Heping to Daqingshui. The project is costing US$1.42 billion. The project was originally scheduled to be completed in 2017. The delays involve relocation
  • Legal step for Czech tunnel project
    April 23, 2014
    The torturous legal case regarding the stalled Blanka Tunnel project in the Czech Republic has taken one step forward. An arbitration court in the country has ruled that the tunnel has to be completed within five months' time. The construction work was halted earlier due to a dispute between the contractor and the city authorities. The tunnel is required to help reduce traffic congestion in the Czech capital Prague with work having commenced in 2007. The project was originally supposed to be ready for traff