Skip to main content

Croatia issues permit for bridge over Sava River

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina. Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports. The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering. Croatia is to pay €70 million as its share for a bridge across the R
March 25, 2019 Read time: 1 min

Croatia has issued a permit for construction of a bridge over the Sava River by Bosanska Gradiska and the border with Bosnia e Herzegovina.

Croatia is working closely with the Bosnian motorways company Autoputevi on the bridge, according to Croatian media reports.

The bridge is likely to cost around €23.5 million as noted by a bid submitted by the consortium made up of Duro Dakovic Montaza, Zagreb Montaza and Integral Inzinjering.

Croatia is to pay €70 million as its share for a bridge across the River Sava near Gradiska, in Republika Srpska, part of Bosnia-Herzegovina.

A year ago, the 2465 European Commission set aside a €6.8 million grant for construction of the bridge.

For more information on companies in this article

Related Content

  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • Tender cancelled for fifth section of Moscow’s central ring road
    December 15, 2014
    Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate
  • Eurovia secures a deal for Czech D35 work
    May 30, 2018
    The Czech division of Eurovia has won a €126 million contract for a section of the D35 motorway. The Czech road and motorway management company RSD sealed the deal Eurovia, part of the Vinci Group, for construction of 14.7km between Casy and Ostrov, in the Pardubice region. Eurovia submitted a bid of nearly €126 million for the work that the government and the European Union had estimated in 2016 might cost around €194 million. Other bids had been submitted by M-Silnice and Astaldi. Eurovia recently an
  • Slovakia concerned over tenders for D1 Presov and D3 Cadca bypasses
    September 14, 2016
    The Slovakian government is examining bids for two tenders for motorway stretches D1 because of their higher-than-expected costs. The deal involves the Presov West - Presov South stretch and the D3 Cadca, Bukov - Svrcinovec section, according to a report in Pravda. Both projects are bypasses of Cadca, near the border with Poland and the Czech Republic, and Presov in eastern Slovakia. The newly appointed transport minister, Arpad Ersek, review the tenders, the Pravda report said. The Slovak Insti