Skip to main content

Contractors competing Colombian construction concessions

The tender process is underway for the third section of Colombia’s Pacific route connecting La Pintada and La Felisa. This route forms part of the Autopistas de la Prosperidad project between Medellin and Buenaventura. The 231km section includes 26 bridges and three tunnels and will cost some US$621.4 million to construct. All three sections plus the Magdalena and Norte highway will be awarded by July 2014 with works due to begin in 2015. The highway stretches should all be finished in 2020. For the first s
May 13, 2014 Read time: 2 mins
The tender process is underway for the third section of Colombia’s Pacific route connecting La Pintada and La Felisa. This route forms part of the Autopistas de la Prosperidad project between Medellin and Buenaventura. The 231km section includes 26 bridges and three tunnels and will cost some US$621.4 million to construct. All three sections plus the Magdalena and Norte highway will be awarded by July 2014 with works due to begin in 2015. The highway stretches should all be finished in 2020. For the first section of the Pacific route, the bidders were Autopistas Conexion Pacifico 1 (Episol and other firms) and Infraestructura Vial para Colombia. For the second section of the same route, there was only one bidder, PSF Concesion La Pintada. Meanwhile Mincivil and Colpatria have submitted Colombia's first private road project to the Ministry of Finance for its approval. The project consists of a double-lane road between Ibague and Cajamarca that will cost $684.6 million and the project will not require any public funding.

Related Content

  • Russia’s US$28 billion road and bridge works
    November 29, 2013
    A series of major transport projects worth a combined value of over US$28 billion are set to significantly enhance connectivity between various parts of Russia. These include the Moscow-St Petersburg highway, work to the transport system in the Rostov region and two new bridges: one over the Belaya river in Ufa, the other over the Kama river in Izhevsk. The tender process for the $4.46 billion contract to build, maintain, repair, and operate a section of the Moscow- St Petersburg highway has been announc
  • Colombia key tunnel project – new completion date
    March 6, 2019
    A new completion date has been set for the La Linea Tunnel project in Colombia. The work should now be finished in late 2020, although the project was originally intended to be ready by late 2016. The various contracts to complete the Cruce de la Cordillera Central route will be awarded in April 2019 by the national road institute (Invias). The contracts will include strict measures to ensure that contractors will comply with all the terms of the deal. The Colombian Government previously allotted US$204.5 m
  • Colombian concession connection contracts
    May 4, 2022
    Colombian concession connection contracts are being considered.
  • Colombian road works awarded
    August 12, 2022
    Colombian road works have been awarded.