Skip to main content

Contractor uses explosives to demolish Brazilian overpass

A demolition contractor has carried out an explosive demolition on an overpass in Brazilian city, Rio de Janeiro. The demolition work is being carried out as part of the upgrades to the city’s port district in preparation for the 2016 Olympic Games. Around 1tonne of explosives were used to place charges at key points within the structure of the Perimetral overpass. The demolition work was successful and the structure was brought down safely without incident.
December 2, 2013 Read time: 1 min
A demolition contractor has carried out an explosive demolition on an overpass in Brazilian city, Rio de Janeiro. The demolition work is being carried out as part of the upgrades to the city’s port district in preparation for the 2016 1558 Olympic Games. Around 1tonne of explosives were used to place charges at key points within the structure of the Perimetral overpass. The demolition work was successful and the structure was brought down safely without incident.

For more information on companies in this article

Related Content

  • Montreal bridge demolished using breakers – VIDEO
    October 20, 2014
    A demolition contractor in Canada has carried out a successful demolition of an old bridge in Montreal. The bridge crossed the 401 highway and was removed over a weekend. Work was carried out through the night for the structure to be removed within the allotted timeframe.
  • VINCI’s Brazilian highway concession
    March 14, 2025
    VINCI has taken over a key Brazilian highway concession.
  • VIDEO: explosive demolition of Bridge to Long Island in US
    March 24, 2015
    Explosives were used successfully in the US to demolish the Long Island Bridge. The structure formerly provided a connection to Squantum's Long Island, however it had fallen into disrepair and a decision was made to remove the structure. A section of the Long Island Bridge was demolished by a specialist contractor. This saw the implosion of a229m section of the structure connecting with the island.
  • Atlas Copco attachments make short work of the A8 Blaubeurer Weg Bridge
    March 21, 2016
    A reinforced concrete bridge over the Autobahn 8 between Merklingen and Nellingen in southern Germany was demolished overnight due in no small part to the efficient, reliable performance of Atlas Copco hydraulic attachments. In addition to demolition grippers, breakers and pulverisers, the demolition team used the HM 2000 hydraulic magnet to demolish structures and sort demolition waste. There is now nothing to stop the widening of the A8 to six lanes or construction of the parallel high-speed Wendlingen