Skip to main content

Contractor uses explosives to demolish Brazilian overpass

A demolition contractor has carried out an explosive demolition on an overpass in Brazilian city, Rio de Janeiro. The demolition work is being carried out as part of the upgrades to the city’s port district in preparation for the 2016 Olympic Games. Around 1tonne of explosives were used to place charges at key points within the structure of the Perimetral overpass. The demolition work was successful and the structure was brought down safely without incident.
December 2, 2013 Read time: 1 min
A demolition contractor has carried out an explosive demolition on an overpass in Brazilian city, Rio de Janeiro. The demolition work is being carried out as part of the upgrades to the city’s port district in preparation for the 2016 1558 Olympic Games. Around 1tonne of explosives were used to place charges at key points within the structure of the Perimetral overpass. The demolition work was successful and the structure was brought down safely without incident.

For more information on companies in this article

Related Content

  • Urban gridlock for UK capital?
    March 8, 2017
    The UK’s capital London suffers from some of the worst traffic congestion in Europe, with only Moscow registering far worse conditions on a regular basis. Traffic speeds along key routes in the centre of the city have long had a reputation for being low but recent research shows that they have fallen yet again. According to Transport for London (TfL), average traffic speeds in the centre of the city are just 12.5km/h, roughly the same as they were in the 19th century when the majority of road traffic was ho
  • VIDEO: Bridge demolition on key A90 route in Scotland
    November 4, 2015
    Demolition work has been carried out on a bridge crossing the busy A90 route in Scotland, just to the north of the capital, Edinburgh. The bridge carried the B900 over the A90 but had to be removed as its narrow design prevented the route from being upgraded to full motorway status. The first stage of the demolition work was carried out on October 24th and 25th, with the second stage on October 31st and November 1st and final remedial work to be carried out on November 14th and 15th.
  • Young Driver Risk
    April 16, 2018
    Police in the US state of Ohio recently found themselves in a high-speed pursuit involving a vehicle taken without its owner’s consent. The chase lasted for around one hour and the vehicle hit speeds of up to 160km/h during the pursuit, which covered a distance of around 72km in all between Cleveland and Milan. Officers managed to box the car in and bring it to a halt, without anyone being injured. The driver was a 10-year-old boy who took his mother’s car, the second time that the lad had done this in just
  • Concrete pavers improve major highway upgrade
    July 13, 2012
    In Brazil, concrete pavers from Wirtgen are being used to improve sections of the BR-101 highway as well as to construct concrete safety barriers. The use of these machines is of note as it is the first time concrete paving has been used on a federal road in Brazil. The 1st Army Engineering Division of the Brazilian Army is carrying out three of the eight North Eastern sections, as the construction work had to be speeded up project because the road is deemed crucial to the country's economy. Two Wirtgen SP8