Skip to main content

VIDEO: Bridge demolition on key A90 route in Scotland

November 4, 2015
Demolition work has been carried out on a bridge crossing the busy A90 route in Scotland, just to the north of the capital, Edinburgh. The bridge carried the B900 over the A90 but had to be removed as its narrow design prevented the route from being upgraded to full motorway status. The first stage of the demolition work was carried out on October 24th and 25th, with the second stage on October 31st and November 1st and final remedial work to be carried out on November 14th and 15th. The first stage of the demolition required the temporary closure of the A90 in a weekend possession, with any traffic being switched temporarily to the Kincardine Bridge some distance upstream. Geotextiles and wood panels were laid on the surface of the A90 to protect the asphalt from damage as the work was carried out. A number of excavators equipped with hydraulic breakers were used to tear down the old bridge structure, with the concrete rubble and steel reinforcement then being loaded into trucks and hauled away for recycling. The second stage of the bridge demolition involved similar measures to protect the roadway, as will the third.

Traffic on the B900 at South Queensferry had already been switched over to a new, wider bridge. The work is part of a series of upgrades to roads in the area being carried out along with the construction of the new Queensferry Crossing. This spans the Forth Estuary and will carry the major portion of traffic currently using the Forth Road Bridge, which opened in 1964.

A full report on the Queensferry Crossing will be included in the November/December 2015 issue of World Highways.

Related Content

  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.
  • VIDEO: UK overnight bridge demolition job
    May 16, 2016
    A spectacular video shows footage a key bridge demolition job in the UK. The bridge crossing the busy A38 near Plymouth was demolished during a weekend possession on the 14th and 15th of May 2016. The footage has been released by 8100 Highways England and shows the old Merafield Bridge at Plympton being demolished overnight on Saturday 14th May, marking the final stage of a £6.3 million maintenance project on the A38.
  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is
  • No video provider was found to handle the given URL. See the documentation for more information.
    No video provider was found to handle the given URL. See the documentation for more information.
    VIDEO - Controlled bridge demolition over motorway
    September 15, 2016

    A UK-based demolition contractor has carried out a successful bridge demolition project over the busy M1 motorway. The specialist firm, Amac Group, used a fleet of excavators fitted with hydraulic breakers and other attachments to break up the bridge in a single overnight possession from 10th-11th September 2016. The bridge demolition is the first of two being carried out as part of the improvement works for a new link road connecting the M1 and A5 routes. The second bridge removal is planned for the 24th-25th September.