Skip to main content

VIDEO - Controlled bridge demolition over motorway

September 15, 2016

A UK-based demolition contractor has carried out a successful bridge demolition project over the busy M1 motorway. The specialist firm, Amac Group, used a fleet of excavators fitted with hydraulic breakers and other attachments to break up the bridge in a single overnight possession from 10th-11th September 2016. The bridge demolition is the first of two being carried out as part of the improvement works for a new link road connecting the M1 and A5 routes. The second bridge removal is planned for the 24th-25th September.

No video provider was found to handle the given URL. See the documentation for more information.
No video provider was found to handle the given URL. See the documentation for more information.

Related Content

  • Controlled demolition development
    January 25, 2017
    The development of reliable hydraulic attachments has brought a revolution in demolition technology. The hydraulic breaker, pioneered by the Krupp and Montabert brands, has firmly taken hold with a huge range of manufacturers now offering machines. Hydraulic attachment specialists such as Atlas Copco, Indeco and Sandvik (with its Rammer brand) now offer a range of tools that can deliver high efficiency and safety in demolition work. Meanwhile, developments with smaller tools offer productive methods for rep
  • VIDEO: Bridge demolition on key A90 route in Scotland
    November 4, 2015
    Demolition work has been carried out on a bridge crossing the busy A90 route in Scotland, just to the north of the capital, Edinburgh. The bridge carried the B900 over the A90 but had to be removed as its narrow design prevented the route from being upgraded to full motorway status. The first stage of the demolition work was carried out on October 24th and 25th, with the second stage on October 31st and November 1st and final remedial work to be carried out on November 14th and 15th.
  • VIDEO of specialist contractor’s successful bridge demolition in Canada
    May 12, 2015
    Specialist contractor Priestly Demolition recently carried out a successful project in Ontario, Canada. The firm used its specialist skills to remove The Fountain Road Overpass, crossing Highway 401. A fleet of excavators equipped with demolition tools, including breakers and cutting equipment, was brought into to carry out the work using an overnight closure of the highway. Other machines including wheeled loaders and backhoe loaders were used to remove the broken out materials and to carry out other general duties.
  • VIDEO: UK overnight bridge demolition job
    May 16, 2016
    A spectacular video shows footage a key bridge demolition job in the UK. The bridge crossing the busy A38 near Plymouth was demolished during a weekend possession on the 14th and 15th of May 2016. The footage has been released by 8100 Highways England and shows the old Merafield Bridge at Plympton being demolished overnight on Saturday 14th May, marking the final stage of a £6.3 million maintenance project on the A38.