Skip to main content

Contractor STRABAG is building Poland’s S8 route

Austrian contractor STRABAG is now working on designing and building the new S8 route in Poland. This €57 million project will provide a new 10km route connecting Radziejowice and Przeszkoda. The road is being built from concrete and is due for completion within 31 months. The project was awarded to STRABAG by Poland’s General Directorate for National Roads and Highways (GDDKiA). In addition to building the dual carriageway, the work also involves constructing the Żabia Wola junction as well as several stru
February 9, 2016 Read time: 1 min
Austrian contractor 945 STRABAG is now working on designing and building the new S8 route in Poland. This €57 million project will provide a new 10km route connecting Radziejowice and Przeszkoda. The road is being built from concrete and is due for completion within 31 months. The project was awarded to STRABAG by Poland’s General Directorate for National Roads and Highways (1361 GDDKiA). In addition to building the dual carriageway, the work also involves constructing the Żabia Wola junction as well as several structures, including a bridge over Pisia Tuczna, as well as pedestrian overpasses and three rest areas. Noise barriers and wildlife crossings will also be built along the section.

For more information on companies in this article

Related Content

  • Polish deal done
    February 29, 2012
    The Hermann Kirchner consortium will build a 20km section of Poland's S8 express road linking Walichnowy and Zloczew.
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • London Lower Thames Crossing link
    October 10, 2018
    Progress is being made with regard to the proposed Lower Thames Crossing project close to London.
  • Polish road tenders due to open
    October 1, 2020
    A series of Polish road tenders is due to open.