Skip to main content

Colombia’s high bridge construction completion

Completion of construction work on Colombia Hisgaura Bridge will be achieved in July 2018. The new bridge will be the highest of the cable-stayed type in Latin America and forms part of the road connecting Malaga with Los Curos. The bridge measures 148.3m high by 653m long and work on its deck has been completed. The bridge has cost US$35.3 million to build, with the work being carried out by contractor Sacyr. The new bridge is located close to San Andres and the project has included a number of challenges
June 8, 2018 Read time: 1 min
Completion of construction work on Colombia Hisgaura Bridge will be achieved in July 2018. The new bridge will be the highest of the cable-stayed type in Latin America and forms part of the road connecting Malaga with Los Curos. The bridge measures 148.3m high by 653m long and work on its deck has been completed. The bridge has cost US$35.3 million to build, with the work being carried out by contractor Sacyr. The new bridge is located close to San Andres and the project has included a number of challenges, not the least of which is the mountainous terrain in the area through which the road passes.

Related Content

  • Controversial Russian bridge opens
    May 16, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link opening to use by cars. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Kamaz truck to reach the city of Kerch. The US$2.7 billion bridge forms part of
  • Colombia’s massive highway programme is moving forward
    June 13, 2017
    Colombia is pushing ahead with its 4G road development programme. Progress is being made with the construction of the Girardot-Honda-Puerto Salgar road connection, which is expected to cost US$518.6 million and is around 37% complete.
  • Grand achievement for Intermountain
    July 18, 2012
    A versatile solution has helped with a tricky project at the Grand Canyon in the US – Pierre Peltier When Intermountain Slurry Seal, a division of Granite Construction, submitted its bid in 2009 to repair roads and parking lots along the Grand Canyon’s North Rim, the company knew the job would come with challenges. The remote roads leading from Jacob’s Lake, Arizona, to the North Rim Lodge had deteriorated to a point that the Federal Highway Association’s (FHWA) Central Federal Lands (CFL) Highway Division
  • US$151 million bridge deal for Ferrovial in Puerto Rico
    April 16, 2024
    Ferrovial has won a US$151 million bridge deal in Puerto Rico.