Skip to main content

Colombia’s high bridge construction completion

Completion of construction work on Colombia Hisgaura Bridge will be achieved in July 2018. The new bridge will be the highest of the cable-stayed type in Latin America and forms part of the road connecting Malaga with Los Curos. The bridge measures 148.3m high by 653m long and work on its deck has been completed. The bridge has cost US$35.3 million to build, with the work being carried out by contractor Sacyr. The new bridge is located close to San Andres and the project has included a number of challenges
June 8, 2018 Read time: 1 min
Completion of construction work on Colombia Hisgaura Bridge will be achieved in July 2018. The new bridge will be the highest of the cable-stayed type in Latin America and forms part of the road connecting Malaga with Los Curos. The bridge measures 148.3m high by 653m long and work on its deck has been completed. The bridge has cost US$35.3 million to build, with the work being carried out by contractor Sacyr. The new bridge is located close to San Andres and the project has included a number of challenges, not the least of which is the mountainous terrain in the area through which the road passes.

Related Content

  • New tunnel link proposed for Colombia
    July 23, 2013
    Even as work continues on La Linea tunnel in Colombia, the country’s government has received a proposal for an additional tunnel link. A consortium made up of Colombian companies and Italian firms has suggested building a new tunnel to link Quindio and Tolima. Odinsa, Mincivil, Impregilo and Salini are involved in the consortium and have suggested a PPP as being a possible model under which to construct the link, which could cost in the order of US$531 million and would be 8.5km long. The economic case for
  • Turkey’s Bosporus bridge opening
    August 25, 2016
    Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
  • Colombia sets out major strategy for highway investment
    January 19, 2015
    International interest is strong in Colombia’s infrastructure expansion. Five foreign firms are competing in the country’s 4G road tender process. Fomento de Construcciones y Contratas (FCC), Sinohydro, Sacyr, Tradeco and ICA are amongst the companies competing for 10 contracts worth some US$5.88 billion. The first project opening for tender on 19th May 2015 will be for the Puerta de Hierro-Carreto-Palmar de Varela and Carreto-Cruz del Viso routes. The final tender documents for the 10 projects are being pu
  • Innovative formwork solution to bridge construction
    February 20, 2012
    Innovative solutions are being applied to the construction of bridge structures as Patrick Smith reports. RMD Kwikform Iberica has engineered and supplied specialist formwork and falsework for construction of the much-needed Monteporreiro Viaduct in northern Spain. The viaduct will connect Monteporreiro with the Benedictine Monastery of San Bieito Lérez on the other side of the river, and in the process will ease congestion in the nearby town of Pontevedra, diverting some 5,000 vehicles/day.