Skip to main content

Colombia road project tender process

The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km
July 22, 2019 Read time: 1 min

The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km stretch of dual carriageway, as well as a tunnel measuring 1.4km. The tender process is expected to commence in either the second or third quarter of 2020 and the project will be handled under the PPP model. The project was previously to be constructed the Via Pacifica concession firm but delays resulted in this deal having to be cancelled.

Related Content

  • Colombia: more money for Toyo Tunnel Project
    April 4, 2024
    The Toyo Tunnel Project – the Guillermo Gaviria Echeverri Tunnel Project - covers 18.3km including new roads and is under construction by Consorcio Antioquia al Mar.
  • Bangladesh elevated expressway contract awarded
    November 22, 2021
    The contract for an important Bangladesh elevated expressway contract has been awarded.
  • Norway road deal awarded
    April 1, 2019
    A project for a 19km stretch of Norway’s E6 highway has been awarded. The work will be carried out by the contractor Hæhre Entreprenør, in partnership with the consultants Dr Ing A Aas Jakobsen Trondheim and Sweco Norge. The deal is worth €420 million (NOK 4 billion) and was awarded by Norway’s state-owned road firm Nye Veier. The new section of highway will connect Kvithammar and Åsen, with construction commencing in 2020 and expected to take until 2025 or 2026 to complete. The work includes driving four n
  • $165 million for Colombian road project
    August 7, 2025
    A $165 million funding package is helping finance a key Colombian road project.