Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • Tajikistan road project funding package
    June 18, 2018
    Funding is being secured for a road rebuild and widening project in Tajikistan. The 82km road runs between Dushanbe and Bokhtar and the work should be complete by 2023. The Chinese contractor Xinjiang Beixin is working on phase 1 of the project, building a 33km stretch of the route that is costing US$96 million. Phase 2 of the project is for a 40km section of the route, with construction due to start in the second half of 2018. The phase 2 construction work will be financed by $90 million of funding being s
  • Italy road tunnel project excavated
    July 9, 2018
    Italy’s A3 Highway is being upgraded, which will improve transport between Salerno and Calabria. Upgrading Italy’s A3 highway is of prime importance for developing the south of the country and is a project that has been prioritised for construction. The A3 Salerno-Reggio-Calabria highway is a non-toll road managed by ANAS, Italy’s state-owned company that constructs and maintains highways. The route runs a total of 443km, with the road having originally been built between 1966 and 1974. However, the origina
  • A new East Africa toll road linking Zambia and Tanzania
    October 30, 2023
    A new East Africa toll road is under construction to link Zambia with Tanzania.
  • Australia key contracts for roads and tunnels
    January 17, 2017
    In Western Australia, plans are in hand to construct a 3km tunnel that will form a stretch of the Perth Freight Link project. The tunnel will run between the Stirling Highway and High Street in Fremantle to the Hilton's Stock-Winterfold Road intersection. In addition, the tunnel will also become a stretch of the Roe 9 highway extension project. The Perth Freight Link project is worth US$1.43 billion (A$1.9 billion) in all. Meanwhile a consortium is carrying out work on the NorthLink WA second phase contr