Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • Linking Kenya and Uganda with a new road project
    May 10, 2018
    An upgraded road link will improve transport between Uganda and Kenya - Shem Oirere reports Rainfall patterns and type of soil in an agricultural rich area shared by the neighbouring East African countries of Kenya and Uganda was a key consideration in arriving at the decision to upgrade to bitumen standards 73km of the 118km Kapchorwa-Kitale road that links the two countries. Initially, Uganda had proposed to have the road between Kapchorwa and Suam on its border with Kenya re-gravelled and widened to a
  • Czech tunnel delays
    March 6, 2012
    Progress is being made in the Czech Republic on two key urban tunnel projects. In capital Prague, the Czech contractor Metrostave has now completed the drilling portion of the Letna section of the Blanka road tunnel. Local residents have complained about the noise, vibration and cracks in their properties that they say have been generated by the drilling and blasting work. The project looks as though its completion date will be later than first planned however.
  • Boring complete for Slovakian tunnel project
    November 30, 2022
    Tunnel boring is now complete for a major Slovakian tunnel project.
  • Plans in hand for Colombian highway project
    December 5, 2013
    The Colombian authorities have plans in hand for a US$240 million highway upgrade project. In all, 10 groups have been pre-selected for the tender process for the work, according to a report by Business News Americas. The project is for upgrades and improvements to a 173km stretch of the Puerta de Hierro-Cruz del Viso highway. This work includes improvements to access roads in the area, which lies in Colombia’s northern Sucre, Bolívar and Atlántico departments. The country’s infrastructure agency, ANI, has