Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • Slovakia highway opening faces delays
    March 2, 2017
    A key stretch of the D3 highway in Slovakia will open in the third quarter of 2017. This timescale represents a delay however as the section of road was originally planned to open in the second quarter of 2017. The 4.25km section runs from Zilina Strazov to Zilina Brodno and is costing close to €306 million to construct, with most of the funding being supplied by EU sources. This stretch of the highway is both complex and challenging as it includes a 2.2km section of tunnel as well as bridge over the the Hr
  • Australia highway project underway in Victoria State
    October 5, 2018
    Construction work is now well underway in Australia on the Monash Freeway upgrade in Victoria State. The project has entered its second stage and is costing US$513.5 million (A$711 million. The work involves building 36km of new lanes as well as installing the latest traffic information technology for drivers. For the section from Warrigal Road to the EastLink the router will be widened to five lanes in either direction, compared with four in either direction at present. Meanwhile between Clyde Road and Car
  • Vietnam’s road programme gearing up
    January 7, 2019
    Vietnam’s impressive road development programme is now gearing up, with a series of major projects scheduled to commence in 2019. Work is starting on three key projects: the My Thuan 2 Bridge; the Cam Lo to La Son highway section; the Cao Bo to Mai Son highway section. All three of these projects will form part of the Eastern North-South Expressway, with the work being overseen by the Ministry of Transport (MOT). The My Thuan 2 Bridge will cost some US$214.3 million and will connect Vinh Long Province with
  • Lane Construction to carry out Florida highway deal
    November 24, 2017
    Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Sunco