Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • CRCP is first choice for Belgian highway
    November 28, 2012
    Dan Gilkes reports on a Belgian highway upgrade When the Ministry of Public Works in the Belgian State of Flanders decided to reconstruct and resurface 19km of the N49 Antwerp-Knokke Expressway, continuously reinforced concrete paving (CRCP) with an exposed aggregate surface was the natural material choice. Indeed exposed aggregate, with its high grip and low noise benefits, has been the first option for all motorway surfacing work in Belgium since the 1980s. However, the €15.65 million contract is not a li
  • Cost expectations increase for Stockholm Bypass project
    February 6, 2024
    The cost for Stockholm Bypass project could be up to €4.7 billion.
  • Vietnam bridge, road and highway development projects
    June 20, 2018
    Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
  • Russian road project faces delay
    June 19, 2019
    Russia’s Sochi highway project will not now be completed by 2024. The original plan was to build a 119.km new route to replace the existing A147 route that connects Dzhubga with Sochi. Because of the challenging terrain, this project to build a new four lane highway without the twists and turns of the existing route would have been extremely costly, with a pricetag of as much as US$18 billion. However the project has now been downgraded as being of a lesser priority than other Russian road projects ongoing