Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • Colombian road contracts being awarded
    May 31, 2021
    A series of Colombian road contracts will be awarded in coming months.
  • Texas highway projects moving ahead
    June 4, 2018
    Two major highway projects are now moving ahead in Texas. One project is for the Grand Parkway around Houston, the other is for the construction of three bridges at an interchange on US 290. Grand Parkway Infrastructure is to construct a stretch of the Highway 99 Grand Parkway, which will run around Houston. In all the project for the 295km gyratory highway is costing US$1.28 billion. The package of works was awarded by the Texas Department of Transportation and involves building extra toll lanes as well a
  • Colombia’s La Linea Tunnel completion in sight
    May 7, 2015
    The completion of Colombia’s long-running La Linea Tunnel project is now in sight, finally. Colombia’s president, Juan Manuel Santos, and vice president, German Vargas Lleras, made a joint announcement that the 8.65km long tunnel will be inaugurated in November 2016. The two tunnel drives (from Quindio and Tolima) have now met in the middle and only lining works are left to be completed. Once the tunnel is operational, it will enable trucks to complete the journey between Cajamarca (Tolima) and Calarca (Qui
  • Colombia picks Conconcreto companies for Bogotá-Girardot P3 deal
    August 16, 2016
    Colombia has awarded the tender for the Bogotá-Girardot public-private partnership highway expansion, involving 145km of third lanes. The national infrastructure agency (ANI) announced the winner as a consortium of units of Colombia's Conconcreto group for US$545 million. The consortia consists of Estructura Plural Vías a Girardot, made up of Industrial Conconcreto (30%) and Constructora Conconcreto (70%). The winning group beat out four other consortia, according to ANI, to building the first six-lan